The Base For Your Building

9

FRONT

(DOOR)

FRONT

(DOOR)

Base

     B09

16"/24"

40,6 cm/61,0 cm

OPTION 1: ARROW FLOOR FRAME KIT:

 

(Order No. FB106-A or 68381-A)

Arrow has the best base for your building in this simple kit. It keeps stored items above the ground.  This kit should be used with one
of the following:

A. 

To support a plywood deck 

B.  

To be filled with sand. We recommend the combined use of

1. 

an 

ARROW FLOOR FRAME KIT 

and 

2. 

an 

ARROW ANCHORING KIT 

as an effective method of securing the building to the ground.

Allow 1 - 2 hours for construction.

OPTION 2: Wood Platform

If you decide to build your own base, be sure to select the appropriate materials.
These are the recommended materials for your base:

 2 x 4's (38 mm x 89 mm) Pressure Treated Lumber 

 5/8" (15,5 mm) 4 x 8 (1220 mm x 2440 mm) Plywood-exterior grade

 10 & 4 penny Galvanized Nails 

 Concrete Blocks (optional)

The platform should be level and flat (free of bumps, ridges etc.)
to provide good support for the building. The necessary materials
may be obtained from your local lumber yard.

To construct the base follow instructions and diagram.

Construct frame (using 10 penny galvanized nails)
Measure 16"/24" (40,6 cm/61,0 cm) sections to construct
inside frame (see diagram)
Secure plywood to frame (using 4 penny galvanized nails)

Allow 6 - 7 hours for construction.

OPTION 3: Concrete Slab

The slab should be at least 4" (10,2 cm) thick. It must be level and flat to provide good support for the frame.
The following are the recommended materials for your base.

 1 x 4's (19 mm x 89 mm) (will be removed once the concrete cures)

 Concrete 

 Sheet of 6 mil plastic

 We recommend for a proper strength concrete to use a mix of:

 1 part cement 

 3 parts pea sized gravel 

 2 1/2 parts clean sand

Prepare the Site/Construct a Base

1. Dig a square, 6" (15,2 cm) deep into the ground (remove grass).
2. Fill up to 4" (10,2 cm) in the square with gravel and tamp firm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 1x4 (19 mm x 89 mm)
    lumber.
5. Pour in concrete to fill in the hole and the frame giving a
   total of 4" (10,2 cm) thick concrete. Be sure surface is level.

Allow 3 - 5 hours for construction and a week for concrete curing time.

Note: Finished Slab dimensions, with lumber removed.

Note: Platform/Slab will extend 9/16" (1,4 cm) beyond floor

 frame on all four sides. Seal this 9/16" (1,4 cm) of wood with a

 roofing cement (not included), or bevel this 9/16" (1,4 cm) of

concrete when pouring, for good water drainage.

68 3/4"

174,6 cm

97 1/2"

247,7 cm

97 1/2"

247,7 cm

Содержание EH86-A

Страница 1: ...tions on Assembly Call 1 800 851 1085 Do not return to dealer they are not equipped to handle your requests Storage Area 43 Sq Ft 237 Cu Ft 4 0 m2 6 7 m3 BUILDING DIMENSIONS Size rounded off to the nearest foot 2 4 m x 1 7 m 247 7 cm x 174 6 cm 253 4 cm 181 0 cm 177 5 cm 240 7 cm 167 6 cm 174 3 cm 110 5 cm 152 4 cm CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PI...

Страница 2: ...ble by mail order or at your local dealer or you may construct a base and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building All part numbers can be found on the parts All of these numbers before the must agr...

Страница 3: ...mwork Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of base you wish to use in order to form a comple...

Страница 4: ...ntrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid distractions and any accidents which may occur Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call...

Страница 5: ...ricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the ...

Страница 6: ... lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus five heavy duty snap in hangers and a small tool holder for screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for garage basement or the back of any door Fits all ...

Страница 7: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 7 ...

Страница 8: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 8 ...

Страница 9: ...6 cm 61 0 cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction OPTION 3 Concrete Slab The slab should be at least 4 10 2 cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your base 1 x 4 s 19 mm x 89 mm will be removed once the concrete cures C...

Страница 10: ...on instruction AnchoringintoConcrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 6 mm x 152 mm Lag Screws ArrowAnchoringKit ModelNo AK4or60298 Recommended for use with any suggested base Contains 4 Anchors with Cable Clamps and installation instruction AnchoringintoWood Post Use...

Страница 11: ...oof Trim Cap 2 right 2 left 66045 Handle 2 66646 Washer 279 8 sheets of 40 65109 8 32AcornNut 6 PackedwithScrews 67468 Peak Cap 2 ArrowLogo 65004 8Ax5 16 8mm Screw 266 65923 8 32x3 8 10mm Bolt 105 65900A 10Bx1 2 13mm BlackScrew 8 PackedwithScrews 65103 8 32HexNut 105 Hardware B11hw 6228 Track Support 2 7916 RoofBeamBracket 4 66769 Door Slide 4 ...

Страница 12: ... 9 8466 Right Roof Panel 2 10 8467 Left Roof Panel 2 11 8474 Roof Beam 3 12 8476 Side Wall Angle 3 13 9920 Side Wall Channel 2 14 8482 Side Roof Trim 2 15 8941 Ramp 1 16 8946 Side Floor Frame 2 17 6515 Wall Panel 4 18 6278 Vertical Door Brace 2 19 10478 Right and Left Doors 2 20 6243 Wall Panel 2 21 9369 Door Jamb 2 22 9924 Rear Wall Channel 2 23 9377 Rear Floor Frame 2 24 9378 Door Track 2 25 937...

Страница 13: ...13 Assembly by Key No B13 11 9 5 5 10 14 8 12 12 11 11 10 6 7 9 5 5 14 7 6 4 24 24 2 3 3 1 1 20 20 27 27 17 17 13 13 17 17 26 26 21 21 18 18 19 19 16 16 25 25 15 3 3 23 23 12 22 22 4 ...

Страница 14: ...the rear floor frames as shown The holes in these pieces will align when the pieces are posi tioned with correct amount of over lap See the illustrations below for the proper overall length of the rear floorframe Jointheframesbyinsert ingfiveboltsintoframesetasshown 3 Double check the length of each and set these pieces aside for later use 14 Step 1 B14 Parts Needed For Floor Frame Assemblies 8941...

Страница 15: ...l pieces as shown in the figure and fasten the two pieces together with one bolt in the center hole three holes will align 2Overlaptherearwallanglepieces as shown in the figure and fasten them together with one bolt in the center hole 3 Double check the length of each and set these pieces aside for later use 9924 9924 STEP 1 RearWallChannel 94 5 8 240 3 cm 6615 STEP 2 6615 Rear Wall Angle 94 5 8 2...

Страница 16: ... join the two gables andsupporttheroofpanels Themain roof beam is made up of two pieces fastened together 1 Place the side wall angle back to back with a roof beam and fasten together using ten screws 2 Set this piece aside for later use Assembled 8476 Side Wall Angle 8474 Roof Beam Main Roof Beam STEP 1 ...

Страница 17: ...ized pieces end to end as shown 2 Insert four screws from the under side only Hint The holes in the top side of the doortrackassemblyareforfastening the gable to the top of the front wall in a later step 3 Position door slides onto the legs from the end of door track assembly as shown in the end view 4 Set this piece aside for later use 66769 STEP 3 94 5 8 240 3 cm STEP 4 END VIEW STEP 1 9378 STEP...

Страница 18: ...he front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square NOTE If using a wood platform or concrete slab do not fasten the floor frames to your base at this time You will anchor the building after it is erected STEP 1 9377 RIGHT REAR 8946 8946 Level RIGHT FRONT 9379 STEP 2 When Di...

Страница 19: ...l in each position as shown NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to com plete the assembly today A partially assembled building can be severely damaged by light winds Each screw and bolt in the wall re quires a washer 19 3 Double check the part numbers of the wall panels before proc...

Страница 20: ...embly across the middle of the rear wall using screws 3Fastenthesidewallanglesacross the inside top of the side panels us ing screws Side wall angles must overlap rear wall angle in corners 4 Fasten the side wall channels across the middle of the side panels usingscrews Fastenoverlapsinrear corners with screws 5 Fasten the door track assembly holes on top across the top of the front wall panels us...

Страница 21: ... holes line up with the holes in the frame 3 Fasten the wall panels at the top and bottom with screws 4 Fasten the center of each panel to the wall channel with screws Fasten overlapping ribs using a bolt and nut with two screws 5 When you have attached all wall panels in the correct positions the building will look like this STEP 2 6243 Panels rest on frame as shown 6243 6515 6515 6515 6515 Crimp...

Страница 22: ...utsandacorn nuts as shown Push a plug into hole at center of jamb closest to door opening 2Fastenthetopofthe doorjambto the door track with two screws Do the same for the bottom into frame Repeat steps 1 through 2 for the opposite door jamb Cross Section Top View 1 STEP INSIDE OF BUILDING 2 STEP Plug 9369 Hex Nut Plug Acorn Nut TOP VIEW DoorTrack 9369 3 bolts Bolt F R O N T TOP VIEW DoorTrack TOP ...

Страница 23: ...ece Carefully separate them before continuing 1 Attach the four roof beam brack ets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable Step 10 B23 Parts Needed For Gable Assemblies 7906 Right Gable 2 7907 Left Gable 2 7916 Roof Beam Bracket 4 7907 Washer Roof Beam Brackets 7916 7906 FRONT 1 STEP ...

Страница 24: ... On the rear gable use a bolt and nut at the overlapping rear wall angle On the front gable leave out 2 screws closest to center gable leg 2 Join the left and right gables together with a gable brace using boltsandnutsinthebottomtwoholes only 3 Repeat Steps 1 2 for the door track on the front of building except for the track supports fasten as shown 2 STEP 6658GableBrace Track Supports 6228 Gable ...

Страница 25: ...asten the main roof beam to the gable brace of the front gable 2 Fasten the other end of the main roof beam to the gable brace of the rear gable 3Fastentheremainingroofbeams small holes on top as shown using bolts and nuts 1 STEP 8474 Roof Beam Main Roof Beam Assembly 2 STEP 3 STEP ...

Страница 26: ...es will align Don t anchor the floor frame NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels by their numbers Note the sequence and position they are to be installed 2Positiontherightroofpanelatthe back right corner and fasten to the gable with 5 bolts and nuts and roof beams using 2 screws Do not fasten the lower end of the panel to the ...

Страница 27: ...y 27 8467 Left Roof Panel 2 7875 Roof Panel 4 8466 Right Roof Panel 1 2 Cut2short2 5 1cm stripsoffthe roll of weather stripping tape and put them aside Cover the joint at the peak with weather stripping tape Unroll the tape and press it down over the opening at the ridge as you install each roof panel Do not cut the tape at this time NOTE If roof beam holes do not line up with the roof panel holes...

Страница 28: ...1 Ridge Cap 1 1 Install the ridge cap on the com pleted roof section using bolts and nuts Do not fasten the ends of the ridge cap at this time 2 Fasten the lower end of the panels to the side wall angles using screws and washers 8461 STEP 2 STEP 1 ...

Страница 29: ...fin ger overbend the bottom flange of the side roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side trim using a screw 4 Fasten the roof panel ribs peak caps and ridge cap together using bolts and nuts Tuck Flange Inward to Fit Inside of Roof Trim Cap 8482 STEP 4 STEP 1 STEP 2 STEP 3 Peak Cap Roof Trim Ca...

Страница 30: ...e vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace in place Fasten to door above and below center connection using 2 screws 3 Put a horizontal door brace onto the top edge and bottom edge and fasten with 1 bolt in the center 4Attachthelowerdoorguidesand bolts as shown 5 Repeat steps 1 through 4 for the left door Horizontal...

Страница 31: ...the door slides 3 Fasten the door to the door slides usingtwo 10Bx1 2 13mm screws per door slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Repeat steps 1 through 3 for the left door Keep this Owner s Manual and Assembly Instructions for future reference STEP 2 HorizontalDoorBrace STEP 1 Gable STEP 3 10Bx1 2 13 mm Screw DoorSlide Adjustment...

Страница 32: ...help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture T...