background image

* Size rounded off to the nearest foot

BUILDING DIMENSIONS

CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.

708871204

Model No.

GD106-A

GDF106

697.68617

VD106-A
VR106-A

Owner's Manual & Assembly Instructions

       X1

                                                                       Exterior Dimensions             Interior Dimensions             Door

       *Approx.       Foundation        Storage Area           (Roof Edge to Roof Edge)              (Wall to Wall)               Opening
           Size               Size             Sq. Ft.  Cu. Ft.        Width      Depth      Height      Width     Depth    Height   Width  Height

         10' x 6'     121" x 68 3/4"           54        345        123 1/4"    71 1/4"     82 1/8"     118 1/4"      66"      80 7/8"   55 1/2" 69 1/4"

3,0m x 1,7m  307cm x 175cm        5,0m

2

      9,8m

3

       313cm       181cm       209cm        300cm      168cm     205cm    141cm   176cm

Содержание 697.68617

Страница 1: ... HANDLING METAL PARTS 708871204 Model No GD106 A GDF106 697 68617 VD106 A VR106 A Owner s Manual Assembly Instructions X1 Exterior Dimensions Interior Dimensions Door Approx Foundation Storage Area Roof Edge to Roof Edge Wall to Wall Opening Size Size Sq Ft Cu Ft Width Depth Height Width Depth Height Width Height 10 x 6 121 x 68 3 4 54 345 123 1 4 71 1 4 82 1 8 118 1 4 66 80 7 8 55 1 2 69 1 4 3 0m...

Страница 2: ...o the ground Available by mail order or at your local dealer or you may construct the foundation and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building All part numbers can be found on the parts All of these ...

Страница 3: ...k Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of foundation you wish to use in order to form a comp...

Страница 4: ...ntrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid distractions and any accidents which may occur Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call...

Страница 5: ...ricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the ...

Страница 6: ...e slab Each kit containsheavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 65cm steel channels plus five heavy duty snap in hangers and a small tool holder for screwdriver...

Страница 7: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 7 ...

Страница 8: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 8 ...

Страница 9: ...using 10 penny galvanized nails Measure 16 24 40 6cm 61cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction OPTION 3 Concrete Slab The slab should be at least 3 to 4 8 10cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your foundation 1 x 4 s ...

Страница 10: ...bit and installation instruction AnchoringintoConcrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 Lag Screws ArrowAnchoringKit ModelNo AK4or60298 Recommended for use with any suggested base Contains 4 Anchors with Cable Clamps and installation instruction AnchoringintoWood Post Use 1 4 Wood...

Страница 11: ...Trim Cap 2 right 2 left 65020 DoorWasher 14 PackedwithScrews 66045 Handle 2 66646 Washer 186 5 sheets of 40 65109 8 32AcornNut 14 PackedwithScrews 67468 ArrowLogo Peak Cap 2 65004 8Ax5 16 Screw 280 65923 8 32x3 8 Bolt 91 65900A 10Bx1 2 BlackScrew 4 PackedwithScrews 65103 8 32HexNut 105 Hardware X11 6228 Track Support 2 65958 8 32x7 8 Bolt 14 PackedwithScrews ...

Страница 12: ...oor Frame 2 11 5288 Corner Post 4 12 9365 Front Wall Channel 2 13 9342 Side Wall Angle 2 14 5287 Splice Post 1 15 7311 Door Jamb 2 16 9344 Siding Stud 6 17 8719 Side Siding 6 18 6635 Gable Brace 2 19 8736 Rear Siding 6 20 8737 Front Siding 6 21 8474 Roof Beam 3 22 8476 Roof Angle 1 23 8468 Right Roof Panel 2 24 6529 Roof Panel 4 25 8469 Left Roof Panel 2 26 8461 Ridge Cap 1 27 8482 Side Roof Trim ...

Страница 13: ...13 Assembly by Key No X13 ...

Страница 14: ...erlap the rear floor frames as shown The holes in these pieces will align when the pieces are posi tioned with correct amount of over lap See the illustrations below for the proper overall length of the rear floorframe Jointheframesbyinsert ingfiveboltsintoframesetasshown 3 Double check the length of each and set these pieces aside for later use 14 Step 1 Q14 Parts Needed For Floor Frame Assemblie...

Страница 15: ...f the rear wall Pro ceed as follows 1Overlaptherightandleftrearwall angle pieces as shown in the figure and fasten them together with one bolt in the center hole 2 Set the assembly aside You will use it later 9338 Right Rear Wall Angle 1 9339 Left Rear Wall Angle 1 STEP 1 2 5 cm 9338Right 9339 Left Rear Wall Angle 118 1 8 3 0 m 2 5 cm ...

Страница 16: ...s join the two gables andsupporttheroofpanels Themain roof beam is made up of two pieces fastened together 1 Place the side wall angle back to back with a roof beam and fasten together using ten screws 2 Set this piece aside for later use Assembled 8476 Side Wall Angle 8474RoofBeam Main Roof Beam STEP 1 ...

Страница 17: ... as shown 2 Insert four screws from the under side only Hint The holes in the top side of the doortrackassemblyareforfastening the gable to the top of the front wall in a later step 3Positiondoorslidesontothelegs from the end of door track assembly as shown in the end view NOTE Flat side on top pins and holes must be oriented as shown 4 Set this piece aside for later use 66242 STEP 3 118 1 8 3m ST...

Страница 18: ... the bottom with nuts on top 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square NOTE If using a wood platform or concrete slab do not fasten the floor frames to your base at this time You will anchor the building after it is erected NOTE If you have purchased a Floor Foundation Kit you need to install it at this time STEP 1 8946 RIGHT REAR 893...

Страница 19: ...mbly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to com plete the assembly today A partially assembled building can be severely damaged by light winds The top frame pieces give rigidity to the side walls and provide a surface for attaching the gables which sup port the roof 4 Fasten the side wall angles be hind the top of the side p...

Страница 20: ...screws into rear floor frame Hint Measure or count holes to de termine if post is centered on rear 2 Fasten the top of the door jambs to the door track with two screws Do the same for the bottom into frame Notched edge faces toward center of building 5287 Splice Post 1 7311 Door Jamb 2 Parts Needed For Splice Post Door Jamb Step 7 X20 20 5287 1 STEP STEP 2 NOTCHED EDGE MUST FACE CENTER OF BUILDING...

Страница 21: ...n with a screw at the lower hole 2 Rest bottom tab large hole out side floor frame Do not fasten tab at this time Repeat procedure for the remaining studs around the building 3 Place front wall channel into position behind corner post and door jamb Fasten using three screws 9344 Siding Stud 6 9365 Front Wall Channel 2 Parts Needed For Studs Front Channel Step 8 X21 21 9344 LARGEHOLE DO NOT FASTEN ...

Страница 22: ...g Fasten both siding panels to stud at this overlap 3 Install side siding to the top as before 4 From inside building fasten siding to corner posts using screws 5 Repeatsteps1through4foroppo site side of building NOTE Be careful to install the correct panel in each position as shown The floor frame must be square and level or holes will not align 8719 Side Siding 6 Parts Needed For Side Siding Ste...

Страница 23: ...ner post and door jamb This siding is fastened from the inside using screws into post and jamb 4 Install front siding to complete both front sections 8736 Rear Siding 6 8737 Front Siding 6 Parts Needed For Rear Front Siding Step 10 X23 23 STEP 2 STEP 3 8737 STEP 1 STEP 4 8737 FRONT 8736 8736 Fasten Top Center of Last Siding to Stud 8737 8736 Front Panels Fasten at Corners Door Jambs from the Insid...

Страница 24: ...e them before continuing 1 Attach the four roof beam brackets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable and holes closest together must be on top Parts Needed For Gable Assemblies Step 11 AG24 6000 Right Gable 2 6001 Left Gable 2 5971 Roof Beam Bracket 4 STEP 1 5971 Roof Beam Brackets Washer 6001 6000 FRONT ...

Страница 25: ...sest to center gable leg 2 Join the left and right gables together with a gable brace using a bolt in the bottom hole only 3 Repeat Steps 1 2 for the door track on the front of building except for the track supports fasten as shown Left Gable Assemblies 2 Right Gable Assemblies 2 6635 Gable Brace 2 Parts Needed For Gables Braces Step 12 X25 25 STEP 2 STEP 3 STEP 1 6635GableBrace 6000 6001 Track Su...

Страница 26: ... the other end of the main roof beam to the gable brace of the rear gable 3 Fasten the remaining roof beams small holes on top as shown using bolts Main Roof Beam 1 8474 Roof Beam 2 Parts Needed For Roof Beams Step 13 W26 26 STEP 2 STEP 1 STEP 3 Main Roof Beam 8474 Roof Beam ...

Страница 27: ... better and holes will align NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels by their numbers Note the sequence and position they are to be installed 2Positiontherightroofpanelatthe back right corner and fasten to the gable with 5 bolts and nuts and roof beams using 2 screws Do not fasten the lower end of the panel to the side wall angl...

Страница 28: ... 8468 Right Roof Panel 1 8469 Left Roof Panel 2 6529 Roof Panel 4 2 Cut 2 short 2 5cm strips off the roll of weather stripping tape and put them aside Cover the joint at the peak with weather stripping tape Unroll the tape and press it down over the opening at the ridge as you install each roof panel Do not cut the tape at this time NOTE If roof beam holes do not line up with the roof panel holes ...

Страница 29: ...61 Side Roof Trim Peak Cap 5 STEP STEP 3 8482 6 3 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap 4 Using your thumb and index fin ger overbend the bottom flange of the side roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners 5 Fasten the roof trim caps to the side t...

Страница 30: ...side the door and fasten to door using 5 bolts and nuts 3 Put a horizontal door brace onto thetopedgeandbottomedge cover ing edge of foam board and fasten with 1 bolt in the center 4 Attach the lower door guides as shown 5 Push 7 holes through foam board where shown using an awl or nail 6 Fasten center of door and install handle using 7 8 bolts door wash ers hex nuts and acorn nuts 7 Repeat steps ...

Страница 31: ...es in the door slides 3 Fasten the door to the door slides using a 10Bx1 2 screw NOTE The four holes in the top of each door allow you to adjust the doors Place the door slide in the middle 2 holes 4 Repeat steps 1 through 3 for the left door Keep this Owner s Manual and Assembly Instructions for future reference STEP 2 HorizontalDoorBrace STEP 1 Gable 3 10Bx1 2 Screw DoorSlide Adjustment Holes Ad...

Страница 32: ... 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture These can do double damage since they give off acid as they decay 4 Touch u...

Отзывы: