The Base For Your Building

FRONT

(DOOR)

FRONT

(DOOR)

Base

     A09

Note: Finished Slab dimensions, with lumber removed.

No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is 

recommended as an eff ective method of properly securing your building after assembly is complete.

OPTION 1: Directly on ground (earth)

Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).  If you choose this option Arrow has a simple kit available to 

provide a fl oor inside the shed to keep stored items off  the ground.  This kit can be used to support a plywood fl oor (wood not included) 

or be fi lled with sand/rock to provide a solid surface. (Order No. FB109-A or 68385-A)

Allow 1 - 2 hours for construction.

OPTION 2: Wood Platform

If you decide to build your own base, be sure to select the appropriate materials.

These are the recommended materials for your base:

 2 x 4's (38 mm x 89 mm) Pressure Treated Lumber 

 5/8" (15,5 mm) 4 x 8 (1220 mm x 2440 mm) Plywood-exterior grade   NOTE:  Pressure Treated Lumber must not be used where it  

    will make contact with your storage building.  The properties of Pressure Treated Lumber will cause accelerated corrosion.  

If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided.

 10 & 4 penny Galvanized Nails  Concrete Blocks (optional)

The platform should be level and fl at (free of bumps, ridges etc.)

to provide good support for the building. The necessary materials

may be obtained from your local lumber yard.

To construct the base follow instructions and diagram.

Construct frame (using 10 penny galvanized nails)

Measure 16"/24" (40,6 cm/61,0 cm) sections to construct 

inside frame (see diagram)

Secure plywood to frame (using 4 penny galvanized nails)

Allow 6 - 7 hours for construction.

OPTION 3: Concrete Slab

The slab should be at least 4" (10,2 cm) thick. It must be level and fl at to provide good support for the frame.

The following are the recommended materials for your base.

 1 x 4's (19 mm x 89 mm) (will be removed once the concrete cures)

 Concrete  Sheet of 6 mil plastic

 We recommend for a proper strength concrete to use a mix of:

 1 part cement  3 parts pea sized gravel  2 1/2 parts clean sand

Prepare the Site/Construct a Base

1. Dig a square, 6" (15,2 cm) deep into the ground (remove grass).

2. Fill up to 4" (10,2 cm) in the square with gravel and tamp fi rm.

3. Cover gravel with a sheet of 6 mil plastic.

4. Construct a wood frame using four planks of 1x4 (19 mm x 89 mm)

    lumber.

5. Pour in concrete to fi ll in the hole and the frame giving a 

   total of 4" (10,2 cm) thick concrete. Be sure surface is level.

Allow 3 - 5 hours for construction and a week for concrete curing time.

                                                                                        

 

Note: Platform/Slab will extend 9/16" (1,4 cm) beyond fl oor

 frame on all four sides. Seal this 9/16" (1,4 cm) of wood with a

 roofi ng cement (not included), or bevel this 9/16" (1,4 cm) of 

concrete when pouring, for good water drainage.

121"

307,3 cm

16"/24"

40,6 cm/61,0 cm

92 3/4"

235,6 cm

121"

307,3 cm

92 3/4"

235,6 cm

9

Содержание MRD108

Страница 1: ...1 2 58 3 0 m x 2 4 m 307 3 cm x 235 6 cm 313 1 cm 241 9 cm 180 0 cm 300 4 cm 228 6 cm 176 8 cm 141 0 cm 147 3 cm 717540520 Storage Area 74 Sq Ft 401 Cu Ft 6 9 m2 11 4 m3 BUILDING DIMENSIONS Size round...

Страница 2: ......

Страница 3: ...our building to the ground Available at your local dealer Arrow s website arrowsheds com or call Arrow s Customer Service department 1 800 851 1085 or you may construct a base and anchoring system of...

Страница 4: ...k Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Ma...

Страница 5: ...oncentrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to...

Страница 6: ...hat prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to pro...

Страница 7: ...to a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus five heavy d...

Страница 8: ...Accessories SPECIAL NOTE If your accessory is shipped via truck line a day time phone number is required to arrange delivery If no one is available to sign for the delivery you may be subject to a re...

Страница 9: ...etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the base follow instructions and diagram Construct frame using 10 penny g...

Страница 10: ...nstruction Anchoring into Concrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6...

Страница 11: ...2 left 66045 Handle 2 66646 Washer 369 10 sheets of 40 65109 8 32 Acorn Nut 4 Packed with Screws 67468 Peak Cap 2 65004 8Ax5 16 8 mm Screw 326 65923 8 32x3 8 10 mm Bolt 161 65900A 10Bx1 2 13 mm Black...

Страница 12: ...66 Door Track 2 12 8995 Wall Panel 6 13 6529 Roof Panel 2 14 6635 Gable Brace 2 15 80251 Right and Left Doors 2 16 7483 Roof Panel 4 17 9900 Door Jamb 2 18 9917 Rear Wall Channel 2 19 8468 Right Roof...

Страница 13: ...13 20 21 22 27 23 23 32 32 32 32 2 2 12 2 2 12 12 12 12 12 26 26 26 26 3 3 4 4 11 11 10 17 17 31 9 9 15 1 1 15 8 8 28 29 29 31 31 31 30 25 25 5 5 18 18 30 25 25 8 8 24 21 7 24 23 23 23 23 23 16 23 16...

Страница 14: ...n these pieces will align when the pieces are positioned with correct amount of overlap See the illustrations below for the proper overall length of the side and rear floor frames Join the frames by i...

Страница 15: ...le pieces as shown in the figure and fasten them together with one bolt in the center hole 4 Make two side wall angles by overlapping the side wall angle pieces as shown Fasten each set together with...

Страница 16: ...ke two of the pressed together roof beams and join them as shown to form the main roof beam assem bly Hold the assembly together and fasten with 14 bolts Build only one Doubled Beam Assembly 3 Fasten...

Страница 17: ...e underside only Hint The holes in the top side of the door track assembly are for fastening the gable to the top of the front wall in a later step 3 Position door slides onto the legs from the end of...

Страница 18: ...the front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diagonally When the diagonal measurements are equal the floor frame is square NOTE If using a wood pla...

Страница 19: ...el 2 9372 Front Wall Panel 2 9362 Corner Panel 4 Step 6 A19 ctr Parts Needed For Corners NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond...

Страница 20: ...blies across the middle of the side panels using screws Fasten overlaps in rear corners with screws 5 Fasten the door track assembly holes on top across the top of the front wall panels using screws S...

Страница 21: ...s line up with the holes in the frame 3 Fasten the wall panels at the top and bottom with screws 4 Fasten the center of each panel to the wall channel with screws Fasten overlapping ribs as before 5 W...

Страница 22: ...ime 2 Fasten a door jamb to the front panel with two bolts nuts and acorn nuts as shown 3 Fasten the center of the door jamb to the front wall panel and the front wall channel with two screws 4 Fasten...

Страница 23: ...taken as one piece Carefully separate them before continuing 1 Apply edge trim to the top edge of the right gables and left gables 2 Attach the four roof beam brackets to the gables using two bolts wa...

Страница 24: ...Hint On the rear gable use a bolt and nut at the overlapping rear wall angle On the front gable leave out 2 screws closest to center gable leg 2 Join the left and right gables together with a gable br...

Страница 25: ...fasten the roof beam to the gable brace of the front gable 2 Fasten the other end of the main roof beam to the gable brace of the rear gable 3 Fasten the single roof beams small holes on top as shown...

Страница 26: ...panels 1 Locate the roof panels by their numbers Note the sequence and position they are to be installed 2 Position a right roof panel at the back right corner and fasten to the top roof beam using a...

Страница 27: ...Roof Panel 2 2 Cut 4 short 2 5 1 cm strips off the roll of weather stripping tape and put them aside Cover the joint at the peak with weather stripping tape Unroll the tape and press it down over the...

Страница 28: ...f weather stripping tape Do not fasten the ends of the ridge cap at this time 2 Install the second ridge cap overlapping the first ridge cap while installing the remaining narrow roof panels Continue...

Страница 29: ...im at the corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side trim using a screw 4 Fasten the roof panel ribs peak caps an...

Страница 30: ...t yet 2 Swing the door handle brace up to the hole on the center of the door and insert a screw 3 Hold the vertical door brace against the center of the inside surface of the door and turn the screw t...

Страница 31: ...the door so that the holes in the door line up with the holes in the door slides 3 Fasten the door to the door slides using two 10Bx1 2 13 mm screws per door slide NOTE The holes in the door slides a...

Страница 32: ...autions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to prot...

Отзывы: