background image

 Parts Needed For 

Roof Beam/Braces

Step 12

N25ctr

 Main Roof Beam (1)

 Single Roof Beam (2)

 9204 Roof Beam Brace (2)

Wrap  the weather stripping  tape  

around the two joined edges of the 

left and right gables.  See diagram.    

Cut the weather stripping to length.

Spread the two halves of the main 

roof beam and fasten the roof beam 

to the gable brace of the front gable.

Roof Beam Brace 9204

STEP

2

Roof Beam Brace 9204

STEP

5

Single Roof Beam Assembly

Fasten the other end of the main 

roof beam to the gable brace of the 

rear gable.

Fasten the single roof beam, 

small holes on top, as shown using 

bolts and nuts.

Fasten a roof beam brace to 

the main roof beam behind the front 

gable by placing the tab on the end 

of the brace between the roof beams.  

Align the tab with the second hole and 

fasten the brace with a bolt and nut.

Fasten the lower end of the roof 

beam brace to the track support 

with a bolt and nut.

Fasten a roof beam brace  be-

tween the rear gable and the roof 

beam at the fi rst hole, as shown.

STEP

7

STEP

4

STEP

3

Spread Two Halves

Of Roof Beams

1

67545 Weather Stripping

STEP

6

STEP

Main Roof Beam 

Assembly

(16)

25

Содержание 697.68220

Страница 1: ...7 cm 300 4 cm 283 8 cm 203 5 cm 141 0 cm 152 4 cm 715490217 Missing Parts Questions on Assembly Call 1 800 851 1085 or assist arrowsheds com Do not return to dealer they are not equipped to handle yo...

Страница 2: ......

Страница 3: ...s website arrowsheds com or call Arrow s Customer Service department 1 800 851 1085 or you may construct a base and anchoring system of your choice Your assembly instructions provide information on a...

Страница 4: ...k Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Ma...

Страница 5: ...weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid distractions an...

Страница 6: ...hat prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to pro...

Страница 7: ...to a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus five heavy d...

Страница 8: ...Accessories SPECIAL NOTE If your accessory is shipped via truck line a day time phone number is required to arrange delivery If no one is available to sign for the delivery you may be subject to a re...

Страница 9: ...of bumps ridges etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the base follow instructions and diagram Construct frame...

Страница 10: ...nstruction Anchoring into Concrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6...

Страница 11: ...ight 2 left 66045 Handle 2 66646 Washer 385 10 sheets of 40 65109 8 32 Acorn Nut 4 Packed with Screws 67468 Peak Cap 2 Arrow Logo 65004 8Ax5 16 8 mm Screw 356 65923 8 32x3 8 10 mm Bolt 165 65900A 10Bx...

Страница 12: ...l 8 11 7743 Roof Panel 4 12 9009 Gable Brace 2 13 9086 Right Roof Panel 2 14 9087 Left Roof Panel 2 15 6869 Ridge Cap 2 16 9917 Rear Wall Channel 2 17 10475 Right and Left Doors 2 18 8934 Ramp 1 19 89...

Страница 13: ...3 3 4 30 5 5 5 5 6 6 6 6 7 7 8 9 9 9 9 10 10 10 10 10 10 10 10 11 11 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 19 19 20 20 20 20 21 21 21 21 21 21 21 21 22 22 22 22 23 23 23 23 24 24 25 25 26 26 27...

Страница 14: ...hese pieces will align when the pieces are positioned with correct amount of overlap See the illustrations below for the proper overall length of the side and rear floor frames Join the frames by in s...

Страница 15: ...pieces as shown in the figure and fasten them together with one bolt in the center hole 4 Make two side wall angles by overlapping the side wall angle pieces as shown Fasten each set together with one...

Страница 16: ...two of the pressed together roof beams and join them as shown to form the main roof beam assem bly Hold the assembly together and fasten with 14 bolts Build only one Doubled Beam Assembly 3 Fasten the...

Страница 17: ...e underside only Hint The holes in the top side of the door track assembly are for fastening the gable to the top of the front wall in a later step 3 Position door slides onto the legs from the end of...

Страница 18: ...the front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diagonally When the diagonal measurements are equal the floor frame is square NOTE If using a wood pla...

Страница 19: ...les will not align STEP 1 6515 9373 9373 6514 6514 REAR FRONT 9373 Panels rest on frame as shown 6514 SIDE TOP VIEW Narrow Side 6514 6515 Wide Side STEP 3 STEP 2 STEP 4 6515 9373 6514 6515 Washer Crim...

Страница 20: ...el as semblies across the middle of the side panels using screws Fasten overlaps in rear corners with screws 5 Fasten the door track assembly holes on top across the top of the front wall panels using...

Страница 21: ...he frame 3 Fasten the wall panels at the top and bottom with screws 4 Fasten the center of each panel to the wall channel with screws Fasten overlapping ribs using a bolt and nut with two screws 5 Whe...

Страница 22: ...me 2 Fasten a door jamb to the front panel with two bolts nuts and acorn nuts as shown 3 Fasten the center of the door jamb to the front wall panel and the front wall channel with two screws 4 Fasten...

Страница 23: ...of beam brackets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable Parts Needed For Gable Assemblies Step 10 WO23 ctr 8576 Right Gable 2 8577...

Страница 24: ...able use a bolt and nut at the overlapping rear wall angle On the front gable leave out 2 screws closest to center gable leg 2 Join the left and right gables together with a gable brace using a bolt i...

Страница 25: ...nd of the main roof beam to the gable brace of the rear gable 4 Fasten the single roof beam small holes on top as shown using bolts and nuts 5 Fasten a roof beam brace to the main roof beam behind the...

Страница 26: ...gable under the roof panel 4 Continue fastening the right roof panel to the gable and lower roof beam using screws bolts and nuts as shown Do not fasten the lower end of the panels to the side wall a...

Страница 27: ...at the ridge as you install each roof panel Do not cut the tape at this time Step 14 WO27ctr Parts Needed For Roof Assembly 9087 Left Roof Panel 1 7743 Roof Panel 4 NOTE If roof beam holes do not line...

Страница 28: ...nd right roof panels as you unroll the weather stripping tape and press it down install the second ridge cap overlapping the first ridge cap Align holes and fasten using bolts and nuts Fasten the rema...

Страница 29: ...and index finger overbendthebottomflangeoftheside roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side tri...

Страница 30: ...ew 3 Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace and door handle brace in place Fasten to door above and below...

Страница 31: ...the door so that the holes in the door line up with the holes in the door slides 3 Fasten the door to the door slides using two 10Bx1 2 13 mm screws per door slide NOTE The holes in the door slides a...

Страница 32: ...otection precautions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In add...

Отзывы: