background image

The main frame pieces give rigidity to 

the side walls and provide a surface 

for attaching the gables which sup-

port the roof.

Fasten the rear wall angle as-

sembly  across the inside top of the 

rear wall using screws.

Fasten the rear wall channel as-

sembly across the middle of the rear 

wall using screws.

Fasten the side wall angles across 

the inside top of the side panels using 

screws. Side wall angles must overlap 

rear wall angle in corners.

Fasten the side wall channel as-

semblies  across the middle of the 

side panels using screws. Fasten 

overlaps in rear corners with screws.

Fasten the door track assembly

(holes on top)  across the top of the 

front wall panels using screws. See 

the fi gure.

NOTE

The wall channels behind the

front wall panels will be installed

in a later step.

 Door Track Assembly (1)

 Rear Wall Angle Assembly (1)

 Side Wall Angle Assemblies (2)

 Rear Wall Channel Assembly (1)

 Side Wall Channel Assemblies (2)

 Parts Needed For 

Frames

Step 7

WO20 ctr

4

STEP

3

STEP

2

STEP

FRONT

9366

5

STEP

1

STEP

9923

9917

5986

10521

Wall Angles

Must Face

Inside

Building

Long Leg

on Top

Opening

Facing in

Short Leg

on Bottom

DOOR TRACK ASSEMBL

Y

(54)

(2)

20

Содержание 697.68220

Страница 1: ...7 cm 300 4 cm 283 8 cm 203 5 cm 141 0 cm 152 4 cm 715490217 Missing Parts Questions on Assembly Call 1 800 851 1085 or assist arrowsheds com Do not return to dealer they are not equipped to handle yo...

Страница 2: ......

Страница 3: ...s website arrowsheds com or call Arrow s Customer Service department 1 800 851 1085 or you may construct a base and anchoring system of your choice Your assembly instructions provide information on a...

Страница 4: ...k Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Ma...

Страница 5: ...weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid distractions an...

Страница 6: ...hat prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to pro...

Страница 7: ...to a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus five heavy d...

Страница 8: ...Accessories SPECIAL NOTE If your accessory is shipped via truck line a day time phone number is required to arrange delivery If no one is available to sign for the delivery you may be subject to a re...

Страница 9: ...of bumps ridges etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the base follow instructions and diagram Construct frame...

Страница 10: ...nstruction Anchoring into Concrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6...

Страница 11: ...ight 2 left 66045 Handle 2 66646 Washer 385 10 sheets of 40 65109 8 32 Acorn Nut 4 Packed with Screws 67468 Peak Cap 2 Arrow Logo 65004 8Ax5 16 8 mm Screw 356 65923 8 32x3 8 10 mm Bolt 165 65900A 10Bx...

Страница 12: ...l 8 11 7743 Roof Panel 4 12 9009 Gable Brace 2 13 9086 Right Roof Panel 2 14 9087 Left Roof Panel 2 15 6869 Ridge Cap 2 16 9917 Rear Wall Channel 2 17 10475 Right and Left Doors 2 18 8934 Ramp 1 19 89...

Страница 13: ...3 3 4 30 5 5 5 5 6 6 6 6 7 7 8 9 9 9 9 10 10 10 10 10 10 10 10 11 11 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 19 19 20 20 20 20 21 21 21 21 21 21 21 21 22 22 22 22 23 23 23 23 24 24 25 25 26 26 27...

Страница 14: ...hese pieces will align when the pieces are positioned with correct amount of overlap See the illustrations below for the proper overall length of the side and rear floor frames Join the frames by in s...

Страница 15: ...pieces as shown in the figure and fasten them together with one bolt in the center hole 4 Make two side wall angles by overlapping the side wall angle pieces as shown Fasten each set together with one...

Страница 16: ...two of the pressed together roof beams and join them as shown to form the main roof beam assem bly Hold the assembly together and fasten with 14 bolts Build only one Doubled Beam Assembly 3 Fasten the...

Страница 17: ...e underside only Hint The holes in the top side of the door track assembly are for fastening the gable to the top of the front wall in a later step 3 Position door slides onto the legs from the end of...

Страница 18: ...the front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diagonally When the diagonal measurements are equal the floor frame is square NOTE If using a wood pla...

Страница 19: ...les will not align STEP 1 6515 9373 9373 6514 6514 REAR FRONT 9373 Panels rest on frame as shown 6514 SIDE TOP VIEW Narrow Side 6514 6515 Wide Side STEP 3 STEP 2 STEP 4 6515 9373 6514 6515 Washer Crim...

Страница 20: ...el as semblies across the middle of the side panels using screws Fasten overlaps in rear corners with screws 5 Fasten the door track assembly holes on top across the top of the front wall panels using...

Страница 21: ...he frame 3 Fasten the wall panels at the top and bottom with screws 4 Fasten the center of each panel to the wall channel with screws Fasten overlapping ribs using a bolt and nut with two screws 5 Whe...

Страница 22: ...me 2 Fasten a door jamb to the front panel with two bolts nuts and acorn nuts as shown 3 Fasten the center of the door jamb to the front wall panel and the front wall channel with two screws 4 Fasten...

Страница 23: ...of beam brackets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable Parts Needed For Gable Assemblies Step 10 WO23 ctr 8576 Right Gable 2 8577...

Страница 24: ...able use a bolt and nut at the overlapping rear wall angle On the front gable leave out 2 screws closest to center gable leg 2 Join the left and right gables together with a gable brace using a bolt i...

Страница 25: ...nd of the main roof beam to the gable brace of the rear gable 4 Fasten the single roof beam small holes on top as shown using bolts and nuts 5 Fasten a roof beam brace to the main roof beam behind the...

Страница 26: ...gable under the roof panel 4 Continue fastening the right roof panel to the gable and lower roof beam using screws bolts and nuts as shown Do not fasten the lower end of the panels to the side wall a...

Страница 27: ...at the ridge as you install each roof panel Do not cut the tape at this time Step 14 WO27ctr Parts Needed For Roof Assembly 9087 Left Roof Panel 1 7743 Roof Panel 4 NOTE If roof beam holes do not line...

Страница 28: ...nd right roof panels as you unroll the weather stripping tape and press it down install the second ridge cap overlapping the first ridge cap Align holes and fasten using bolts and nuts Fasten the rema...

Страница 29: ...and index finger overbendthebottomflangeoftheside roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side tri...

Страница 30: ...ew 3 Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace and door handle brace in place Fasten to door above and below...

Страница 31: ...the door so that the holes in the door line up with the holes in the door slides 3 Fasten the door to the door slides using two 10Bx1 2 13 mm screws per door slide NOTE The holes in the door slides a...

Страница 32: ...otection precautions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In add...

Отзывы: