16
Measure
Every
year/ 7,500
cycles
Every other
year/15,000
cycles
Time*
(minutes)
2.7
&KHFNWKDWWKHRYHUÀRZGUDLQFRQQHFWLRQWRWKH
chamber is tight.
•
-
2.8
&OHDQWKHLQVLGHRIWKHÀXVKLQJFKDPEHU
•
10
2.9
Check the door and door spring.
•
15
3
Process tank
3.1
Clean as required.
•
-
3.2
Check and clean the level sensor.
•
5
3.3
Check that the valves are working and that the
connections are not leaking. Clean as required.
•
10
4
Steam Generators
4.1
Check the connections to the steam generator for
leakage and make sure the surrounding insulation is
intact and no hot surfaces are exposed.
•
5
4.2
Check that the steam generator is working properly.
•
10
5
Main pump
5.1
&KHFNWKDWWKHPDLQSXPSLV¿UPO\DWWDFKHGDQGWKDW
there are no leaks in the connections.
•
5
6
Dosing system
6.1
Check the hoses between the dosing pump and the
detergent holder. Replace if necessary.
•
5-10
6.2
Check the dosage amount. Adjust if necessary.
•
10-30
6.3
Replace hose in the dosing pump.
•
5
6.4
Check that the empty container alarm works. Clean or
replace as necessary.
•
5
6.5
Check the function of the check valve in the steam
generator.
•
5
7
Drainage connection
7.1
&KHFNWKDWWKHGUDLQDJHFRQQHFWLRQLV¿UPO\DWWDFKHG
and that it is not leaking.
•
5
8
Ventilator (Option)
8.1
(3$¿OWHU
•
10
8.2
Check the fan for proper operation and check that the
connections are tight.
•
5
8.3
Check that the check valves are functioning properly.
Clean as required.
•
10
8.4
Check hoses to the fan.
•
5
10
Function check (at each service)
10.1 Run a complete process and be sure there are no deviations according to the
periodic checkpoints.
10.2 Check that the panel’s lights and alarms are functioning.
* The time required is estimated with the top off and may vary depending on the installation settings,
operating conditions and equipment level.