
8
Positioning of Freedom Bath
1
Place Freedom Bath into final position.
By moving Freedom Bath only use the on the illustration
marked areas.
(See figure 1.)
Do not lift, push, shove or pull
the Freedom Bath outside the shown areas.
•
•
•
2
After positioning the tub, check that all utilities are in
correct relationship to the unit.
3
Remove the transport protection placed above the power
box.
(See figure 2.)
Anchoring
The sliding tracks that Freedom Bath is mounted on
double as anchoring. No extra anchoring is therefore required.
Start
•
Remove the service cover on the right side by unscrewing
and unhooking.
(See figure 3.)
•
Connect electrical service to junction box.
(See Electrical Installation on page 14)
.
•
Connect to the water supply system for HOT and COLD
water.
•
Connect tub drain to house drain system.
(See Drain Installation on page 16)
.
•
Turn main power on.
The Power ON is indicated by light in the display.
WARNING!
Lifting, pushing, shoving or pulling the Freedom Bath out-
side the marked areas can damage the product and can
cause injury to the people or the equipment.
CAUTION!
Extra help may be needed to move and adjust the position
of the unit without damage to the finish or components.