Chapter 4: Maintenance
68
1X-E4 Series Installation Manual
System maintenance
Perform the following maintenance tasks to ensure that the fire alarm and
evacuation system works correctly and complies with all required European
regulations.
Note:
Before performing any tests, ensure that fire routing (if configured) is
disabled or that the fire brigade has been notified.
Quarterly maintenance
Test at least one device per zone and verify that the control panel responds to all
fault and alarm events. The control panel power supply and battery voltage
should be checked.
Annual maintenance
Test all system devices and verify that the control panel responds to all fault and
alarm events. All electrical connections must be visually inspected to make sure
that they are securely fastened, that they have not been damaged, and that they
are appropriately protected.
Cleaning the control panel
Keep the outside and inside of the control panel clean. Carry out periodic
cleaning using a damp cloth for the outside. Do not use products containing
solvents to clean the control panel. Do not clean the inside of the cabinet with
liquid products.
Содержание 1X-E4 Series
Страница 1: ...1X E4 Series Installation Manual P N 501 415403 1 50 ISS 13JUN22 ...
Страница 76: ...Chapter 4 Maintenance 70 1X E4 Series Installation Manual ...
Страница 84: ...Chapter 5 Technical specifications 78 1X E4 Series Installation Manual Figure 21 Cabinet without cover ...
Страница 94: ...Appendix A Configuration presets 88 1X E4 Series Installation Manual ...
Страница 98: ...Appendix B Regulatory information 92 1X E4 Series Installation Manual ...