After removing the boiler from its packaging, remove the
template from the separate box containing the connection
kit. N
OTE
: Pay particular attention to any test water that
may spill from the appliance.
Place the template in the position the appliance is to be
mounted and after ensuring it is hanging squarely, use it
to drill the holes for the hanging bracket, connection kit
and flue pipe(s)
NB: For further information relating to the
flue installation please refer to Section 2.9 F
L U E
C
ONNECTION
. (If the appliance is to be fitted on a wall of
combustible material, the wall
must be protected by a
sheet of fireproof material).
If the appliance is to be fitted into a timber framed
building, guidance should be sought from the Institute of
Gas Engineers document R
EF
: IGE/UP/7.
2.5.1.
Drill the wall and plug using those supplied with
the connections kit, position the hanging bracket and
2.5 M
OUNTING THE
A
PPLIANCE
F
IG
. 2.2
In order to allow access to the interior of the boiler for
maintenance purposes, the boiler must be installed in
compliance with the minimum clearances indicated in
F
IG
. 2.2
2.4
C
LEARANCES
L
EGEND
:
A = Central Heating Flow (3/4”)
B = Domestic Hot Water Outlet (1/2”)
C = Gas Inlet (3/4”)
D = Domestic Cold Water Inlet (1/2”)
E = Central Heating Return (3/4”)
2.3
O
VERALL
D
IMENSIONS
F
IG
. 2.1