7
product description
28
770
200
150
120
120
200
180
132
65
67
25
770
Overall view
Overall Dimensions
A. Central Heating Flow
C. Gas Inlet
D. Cold Mains Connection
E. Central Heating Return
450
00
3
00
3
50
50
Minimum clearances
In order to allow easy access to the boiler for
maintenance operations, The boiler must be installed
in accordance with the clearances stated below.
5
5
1. Flue Connector
. Manual Vent
3. Burner
4. Detection Electrode
5. Overheat Thermostat
6. C.H. Return Temperature Probe
7. C.H. Flow Temperature Probe
8. Gas Valve
11. Trap
1. C.H. Pressure Relief Valve
13. Electrical Box
15. Circuit Filter
17. Circulation Pump with Air Release Valve
19. Water Pressure Sensor
0. Silencer
1. Modulating Fan
. Ignition Electrodes
3. Ignitor
4. Thermal Fuse
5. Combustion Analysis Test Point
1
2
3
4
5
6
7
8
11
12
13
25
24
23
22
21
20
17
19
15
Содержание CLAS HE SYSTEM 18
Страница 26: ...26 installation Wiring Diagram For Connection To An Open Vented Cylinder ...
Страница 27: ...27 installation Wiring Diagram For Connection To An MTS Unvented Cylinder ...
Страница 62: ......
Страница 63: ......