10. Installation Requirements
(continued)
1.
Internal termination of condensate drainage pipe to internal stack
2.
External termination of condensate drainage pipe via internal discharge branch
(e.g. sink waste) and condensate siphon
iii) Terminating into a gully, below the grid level but above
the water level.
iv) Into a soakaway.
N
OTE
: If any condensate pipework is to be installed
externally then it should be kept to a minimum and be
insulated with a waterproof insulation and have a continuous
fall. The total length of external pipe used should not exceed
3 metres.
Some examples of the type of condensate terminations can
be found below.
Содержание Benchmark System A 24 RFF
Страница 18: ...18 1 2 A A Fig 13 Fig 15 Fig 12 11 Installing the Boiler continued Fig 14 P P ...
Страница 21: ...21 Fig 20 Fig 21 Fig 22 162 ...
Страница 30: ...30 WIRING DIAGRAM FOR CONNECTION TO AN OPEN VENTED CYLINDER DIAGRAM B ...
Страница 31: ...31 WIRING DIAGRAM FOR CONNECTION TO AN MTS UNVENTED CYLINDER DIAGRAM A ...
Страница 60: ...60 ...