Chapter 1
Overview
The following topics are coved in this section:
•
•
Receiving and Inspecting the Equipment
•
•
•
Obtaining Technical Assistance
•
1.1
Scope
This guide is intended for properly trained service personnel and technicians who need to install the
following Arista Networks Data Center Switches:
•
DCS-7280CR2A-30
•
DCS-7280CR2K-30
•
DCS-7280CR2M-30
Important:
Only qualified personnel should install, service, or replace this equipment.
Seul le personnel qualifié doit installer, service, ou remplacer cet équipement.
1.2
Receiving and Inspecting the Equipment
Upon receiving the switch, inspect the shipping boxes and record any external damage. Retain
packing materials if you suspect that part of the shipment is damaged; the carrier may need to
inspect
them.
If the boxes were not damaged in transit, unpack them carefully. Ensure that you do not discard any
accessories that may be packaged in the same box as the main unit.
Inspect the packing list and confirm that you received all listed items. Compare the packing list with
provides a list of components included with the switch.
1.3
Installation Process
The following tasks are required to install and use the switch:
1.
Select and prepare the installation site (
2.
Assemble the installation tools listed (
Tools and Parts Required for Installation
).
3.
Attach the mounting brackets and install the switch in an equipment rack (
4.
Connect the switch to the power source and network devices (
5.
Configure the switch (
1