Current transformer circuits
Do not open the secondary circuit of a live CT since the high voltage produced
may be lethal to personnel and could damage insulation. Generally, for safety,
the secondary of the line CT must be shorted before opening any connections to
it.
For most equipment with ring-terminal connections, the threaded terminal block
for current transformer termination has automatic CT shorting on removal of the
module. Therefore external shorting of the CTs may not be required, the
equipment documentation should be checked to see if this applies.
For equipment with pin-terminal connections, the threaded terminal block for
current transformer termination does NOT have automatic CT shorting on removal
of the module.
External resistors, including voltage dependent resistors (VDRs)
Where external resistors, including voltage dependent resistors (VDRs), are fitted
to the equipment, these may present a risk of electric shock or burns, if touched.
Battery replacement
Where internal batteries are fitted they should be replaced with the recommended
type and be installed with the correct polarity to avoid possible damage to the
equipment, buildings and persons.
Insulation and dielectric strength testing
Insulation testing may leave capacitors charged up to a hazardous voltage. At the
end of each part of the test, the voltage should be gradually reduced to zero, to
discharge capacitors, before the test leads are disconnected.
Insertion of modules and pcb cards
Modules and PCB cards must not be inserted into or withdrawn from the
equipment whilst it is energized, since this may result in damage.
Insertion and withdrawal of extender cards
Extender cards are available for some equipment. If an extender card is used,
this should not be inserted or withdrawn from the equipment whilst it is energized.
This is to avoid possible shock or damage hazards. Hazardous live voltages may
be accessible on the extender card.
External test blocks and test plugs
Great care should be taken when using external test blocks and test plugs such
as the MMLG, MMLB and MiCOM P990 types, hazardous voltages may be
accessible when using these. *CT shorting links must be in place before the
insertion or removal of MMLB test plugs, to avoid potentially lethal voltages.
*Note: When a MiCOM P992 Test Plug is inserted into the MiCOM P991 Test
Block, the secondaries of the line CTs are automatically shorted, making
them
safe.
Fiber optic communication
Where fiber optic communication devices are fitted, these should not be viewed
directly. Optical power meters should be used to determine the operation or
signal level of the device.
Cleaning
The equipment may be cleaned using a lint free cloth dampened with clean water,
when no connections are energized. Contact fingers of test plugs are normally
protected by petroleum jelly, which should not be removed.
Содержание MiCom P120
Страница 1: ...MiCOM P120 P121 P122 P123 Overcurrent Relays Version 11 Technical Guide P12X EN T A96...
Страница 2: ......
Страница 4: ...P12x EN T A96 Technical Guide Contents Page 2 2 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 13: ...Introduction P12x EN IT A96 MiCOM P120 P121 P122 P123 INTRODUCTION...
Страница 14: ......
Страница 16: ...P12x EN IT A96 Introduction Page 2 8 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 22: ...P12x EN IT A96 Introduction Page 8 8 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 24: ......
Страница 26: ...P12x EN IN A96 Handling Installation and Case Dimensions Page 2 10 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 35: ...User Guide P12x EN FT A96 MiCOM P120 P121 P122 P123 USER GUIDE...
Страница 36: ......
Страница 40: ...P12x EN FT A96 User Guide Page 4 72 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 108: ...P12x EN FT A96 User Guide Page 72 72 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 109: ...Menu Content Tables P12x EN HI A96 MiCOM P120 P121 P122 P123 MENU CONTENT TABLES...
Страница 110: ......
Страница 112: ...P12x EN HI A96 Menu Content Tables Page 2 68 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 179: ...Technical Data P12x EN TD A96 MiCOM P120 P121 P122 P123 TECHNICAL DATA AND CHARACTERISTIC CURVES...
Страница 180: ......
Страница 221: ...Application Guide P12x EN AP A96 MiCOM P120 P121 P122 P123 APPLICATION GUIDE...
Страница 222: ......
Страница 226: ...P12x EN AP A96 Application Guide Page 4 80 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 302: ...P12x EN AP A96 Application Guide Page 80 80 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 304: ......
Страница 305: ...Communications P12x EN CT A96 MiCOM P120 P121 P122 P123 MODBUS DATABASE MiCOM P120 P121 P122 P123 VERSION V11 A...
Страница 306: ......
Страница 367: ...Communications P12x EN CT A96 MiCOM P120 P121 P122 P123 COURIER DATABASE MiCOM P120 P121 P122 P123 VERSION V11 A...
Страница 368: ......
Страница 370: ...P12x EN CT A96 Communications COURIER DATABASE Page 2 248 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 514: ...P12x EN CT A96 Communications COURIER DATABASE Page 146 248 MiCOM P120 P121 P122 P123...
Страница 515: ...Communications P12x EN CT A96 MiCOM P120 P121 P122 P123 IEC 60870 5 103 MiCOM P120 P121 P122 P123 VERSION V11 A...
Страница 516: ......
Страница 518: ...P12x EN CT A96 Communications IIEC 60870 5 103 Page 2 248 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 536: ...P12x EN CT A96 Communications IEC 60870 5 103 Page 20 248 MiCOM P120 P121 P122 P123...
Страница 537: ...Communications P12x EN CT A96 MiCOM P120 P121 P122 P123 DNP 3 0 DATABASE MiCOM P120 P121 P122 P123 VERSION V11 A...
Страница 538: ......
Страница 540: ...P12x EN CT A96 Communications DNP 3 0 Database Page 2 248 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 553: ...Commissioning and Maintenance P12x EN CM A96 MiCOM P120 P121 P122 P123 COMMISSIONING AND MAINTENANCE GUIDE...
Страница 554: ......
Страница 573: ...Connection Diagrams P12x EN CO A96 MiCOM P120 P121 P122 P123 CONNECTION DIAGRAMS...
Страница 574: ......
Страница 579: ...Commissioning Test Record Sheets P12x EN RS A96 MiCOM P120 P121 P122 P123 COMMISSIONING TEST RECORD SHEETS...
Страница 580: ......
Страница 582: ...P12x EN RS A96 Commissioning Test Record Sheets Page 2 60 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 640: ...P12x EN RS A96 Commissioning Test Record Sheets Page 60 60 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 642: ......
Страница 644: ...P12x EN VC A96 Hardware Software Version History and Compatibility Page 2 26 MiCOM P120 P121 P122 P123 BLANK PAGE...
Страница 667: ......