background image

RE ENR.101 – Rèv E – Le 08/04/2014 

 

  page : 3 

SUMMARY 

 
 

Pages 

 

1 - General 

 

 
2 - Security 

 

a) Device  .........................................................................................................................................................  

b) User .............................................................................................................................................................  

 
3 - Put into service 

 

a) Unpacking the unit  ......................................................................................................................................  

b) Installation ....................................................................................................................................................  

c) ¨Put into service ...........................................................................................................................................  

d) Test run after installing .................................................................................................................................   10 

 
4 - Procedure 

  11 

a) Pressure generator models CEH or CEO ....................................................................................................   11 
 

5 - Cleaning/Maintenance 

  12 

a) Cleaning .......................................................................................................................................................   12 
b) Maintenance ................................................................................................................................................   12 
c) Inspection .....................................................................................................................................................   13 
d) Connectors ...................................................................................................................................................   13 
- Threads M10x100, G1/8, 1/8 BSP-TR, 1/8 NPT ............................................................................................   13 
- Threads M12x150, M16x150, M18x150, M20x150, G1/4, G3/8, G1/2, 1/4 BSP-TR, 3/8 BSP-TR, 

1/2 BSP-TR, 1/4 NPT, 3/8 NPT, 1/2 NPT ...................................................................................................   13 
 

6 - Annexes 

  14 

Options ..................................................................................................................................................................   14 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Read the instructions before handling and retain this 
information for future use 
 

All rights reserved AREMECA 

 

 

 

Содержание CEH Series

Страница 1: ...ncerns the models model CEH 800B model CEH 1250B model CEO 700B Zone Industrielle Sud Rue Marc Séguin 41100 Vendôme Tel 33 0 2 54 80 79 30 Fax 33 0 2 54 80 79 31 E mail aremeca wanadoo fr site www aremeca instrumentation com Operating Instructions English Modèle fourni N de Série Fabriqué le Contact Commercial d regal aremeca fr ...

Страница 2: ...RE ENR 101 Rèv E Le 08 04 2014 page 2 ...

Страница 3: ...11 a Pressure generator models CEH or CEO 11 5 Cleaning Maintenance 12 a Cleaning 12 b Maintenance 12 c Inspection 13 d Connectors 13 Threads M10x100 G1 8 1 8 BSP TR 1 8 NPT 13 Threads M12x150 M16x150 M18x150 M20x150 G1 4 G3 8 G1 2 1 4 BSP TR 3 8 BSP TR 1 2 BSP TR 1 4 NPT 3 8 NPT 1 2 NPT 13 6 Annexes 14 Options 14 Read the instructions before handling and retain this information for future use All...

Страница 4: ...RE ENR 101 Rèv E Le 08 04 2014 page 4 ...

Страница 5: ...CA reserves the right to alter the content or form of this manual at any time and without notice And to make technical amendments to change the product Responsibility AREMECA is not liable for any damage caused by not in accordance with intended usage non compliance with instructions for use use of the instrument by unqualified untrained operator a transformation modification of the device carried...

Страница 6: ... use as described in this document In this case of misuse or mishandling outside the technical specifications contained in this manual The instrument must be immediately isolated identified as inoperative and must be checked by our service department Precautions storage and transport It s necessary to take care of the unit during storage or transportation It must be protected from moisture shock e...

Страница 7: ...ations commissioning of the instrument performance Personal protective equipment PPE The personal protective equipment must be defined in the security register of the user company and made available to the operator These devices are used to protect the operator from potential risks that impede their safety and health at work Protecting fluid Wear eye protection protects the eyes against splashes a...

Страница 8: ...r what is missing b Installation Preferably install your unit in a stable and controlled environment You will get better performance if the temperature and humidity of the room are stable the workstation is clean and dry protected from drafts noise vibration and without passing Component Identification 1 capstan 2 axis de rotation 3 clamping knob 4 connector 5 fastening screw 6 tank 7 valve Instal...

Страница 9: ...illing the device with the fluid 1 Open valves 7 and turn the capstan 1 in the direction of clockwise until reaching the stop limit switch forward 2 Remove the filler cap on the tank 3 Fill the 3 4 tank with the correct fluid Don t use other liquids Our devices are mounted and designed to a standard use They function with the fluid provided Some fluids such skydrol castor oil etc are corrosive and...

Страница 10: ...see chapter procedure to verify and validate the operational statues of the pressure generator Noted During calibration of instruments with a large volume the amount of fluid in the pressure generator may not be sufficient to achieve the desired pressure in this case the instrument must be filled as much as possible before being connected to the generator to reduce the useful volume of dluid As an...

Страница 11: ...lockwise c Close the valve 7 d Turn the capstan 1 in the direction of clockwise until reaching the calibration pressure Maximun operating pressure CEH 800B oil 820 bar CEH 1250B oil 1270 bar CEO 700B water 720 bar e Realize the measurement point Reduce pressure f After the readings measures turn the capstan 1 in the opposite direction clockwise g Open the valve 7 h The instruments can be disassemb...

Страница 12: ...he pressure generator b Maintenance Valves Generator and dead weight are equipped with instrumentation valves it s imperative to observe the following guidelines Maximum torque applicable abutment valve closed 4 Nm Tank oil Make sure the tank contains enough liquid to make the required calibrations If necessary fill the tank with the same liquid as that already used Don t mix different types or br...

Страница 13: ...able as an option Suitcase with 4 connectors type G Ref OP0171 Suitcase with 4 connectors type NPT Ref OP0172 Suitcase with 4 connectors type BSPTR Ref OP0173 Suitcase with 5 connectors type M Ref OP0174 Suitcase with 17 connectors Ref OP0037 standard o ring Ref OP0038CEO Chap 6 Annexes OPTIONS Oils OP0032 1 liter Oil H32 CEH 800B CEH 1250B Connectors OP0174 Suitcase with 5 connectors metrics M10x...

Страница 14: ...h 4 connectors BSPTR 1 8BSPTR 1 4BSPTR 3 8BSPTR 1 2BSPTR OP0037 Suitcase with 17 connectors all connectors Kit cleaning OP0025 Cleaning kit for tank OP0062 Cleaning bench for manometers OP0023 Separator Transport OP0029 Protective cover for economic generator ...

Страница 15: ...RE ENR 101 Rèv E Le 08 04 2014 page 15 ...

Отзывы: