Noted :
This operation is not imperative if the
generator is used for pressures lower than
400 bar ; in this case, insert 4 skates of
stabilization supplied in 4 openings Ø 9 mm
on the crankcase.
- Make sure that o-ring are well positioned on the connectors
4
.
> Dirty or polluted gauges must be cleaned
before mounting the pressure generator to
prevent contamination on the hydraulic
circuit. Don't clean the tank with alcohol
Option : cleaning bench (Ref.OP0062)
c) Put into service
> the generators are equipped with
precision valves instrumentation, it is
imperative to observe the following
guidelines to keep your machine in good
working condition.
Filling the device with the fluid
1.
Open valves
7
and turn the capstan
1
in the direction of clockwise until reaching the stop limit
switch forward.
2.
Remove the filler cap on the tank
3.
Fill the 3/4 tank with the correct fluid. Don't use other liquids.
> Our devices are mounted and designed to
a standard use. They function with the
fluid provided. Some fluids such skydrol,
castor oil etc... are corrosive and can
damage the o-ring of your device.
On request : we can deliver a device
designed for these fluids.
4.
Put the device to be tested and the reference instrument on the connectors 4.
5.
Turn completely the capstan in the opposite direction of clockwise until the stop end (the
variable volume of the generator is loaded with the fluid).
6.
If you need, complete the level of the tank.
Purging the device
1.
Close the valve
7
.Tighten without excess.
4
Содержание CEH Series
Страница 2: ...RE ENR 101 Rèv E Le 08 04 2014 page 2 ...
Страница 4: ...RE ENR 101 Rèv E Le 08 04 2014 page 4 ...
Страница 15: ...RE ENR 101 Rèv E Le 08 04 2014 page 15 ...