RE ENR.101 – Rèv E – Le 08/04/2014
page : 8
a) Unpacking the unit
Upon receipt of the equipment, check the status and content of your package. All of the following
elements must be present in the package :
- 1 compressor
- 0.5 liter of Oil for models CH1, CH2
- 1 capstan consists of 4 delivered arms removed
- 2 connectors G1/2 (supplied as standard unless otherwise specified)
- 1 manual
Check that there isn't damage or breakages during transport. If there are missing items, please
immediately notify AREMECA or your local distributor for what is missing.
b) Installation
Preferably, install your unit in a stable and controlled environment
You will get better performance if :
> the temperature and humidity of the room
are stable,
> the workstation is clean and dry,
protected from drafts, noise, vibration,
and without passing
Component Identification
1
: capstan
2
: axis de rotation
3
: clamping knob
4
: connector
5
: fastening screw
6
: tank
7
: valve
Installation / Fixation / Assembly
- Install pressure generator on a established stable an rigid about 0,90 m tall.
- Insert the capstan
1
on the axis of rotation
2
, screw the clamping knob
3
at the axis of rotation
- Fix the generator on the table with the 4 fastening screw
5
use the supplied key. See plan of
drilling (following page)
Содержание CEH Series
Страница 2: ...RE ENR 101 Rèv E Le 08 04 2014 page 2 ...
Страница 4: ...RE ENR 101 Rèv E Le 08 04 2014 page 4 ...
Страница 15: ...RE ENR 101 Rèv E Le 08 04 2014 page 15 ...