background image

Arcserve Appliances N Series Hardware Installation Guide for Lenovo Large HX5521 SR650                                                                              

 

 
 

14 

9.

 

Software Sources 

 

Name 

Purpose 

Source 

Lenovo XClarity 
Administrator 

Discover and manage 
the nodes 

Download from 

https://datacentersupport.lenovo.com/us/en/solutions
/lnvo-lxcaupd

.  For more information about Lenovo 

XClarity Administrator, click 

https://www3.lenovo.com/us/en/data-
center/software/systems-management/xclarity/

 

 

Nutanix AOS 

Acropolis Operating 
System 

Version 5.20 LTS is preloaded on the delivered nodes. 
Upgrades are available from mynutanix.com.  Log into 
the mynutanix.com, find the blue Launch button for the 
Support Portal, and then select 

Downloads

Nutanix 
Foundation 

Bootstrap, deploy 
and configure a bare-
metal Nutanix cluster 
from start-to-end, 
(reload AOS) 
 

Log into the mynutanix.com, find the blue Launch 
button for the Support Portal, select 

Downloads

, and 

then look for Essential Tools – Foundation. 

Nutanix Prism 

Management and 
operations for 
virtualized 
datacenter 
environments 
including 
administration, 
reporting, and 
system 
administration 
automation 

Log into the mynutanix.com, find the blue Launch 
button for the Support Portal, select 

Downloads

, and 

then look for Prism Central. 

Arcserve N-Series 
Mine deployment 
Image 

Arcserve Nutanix 
Mine deployment 
image bundled with 
Arcserve Unified 
Data Protection 
(UDP) and LBS ISO 

Download 

https://support.arcserve.com/s/article/Arcserve-
Appliance-Nseries-UDP-Nutanix-Mine-Build

 

 

Windows Server 
2019 

Run as a VM on the 
Nutanix cluster as 
the operating system 
that runs the 
Arcserve UDP 
software and Nutanix 
Prism 

Arcserve provides license with the hardware. To 
download the ISO image, use the same process that is 
used for the Arcserve N-Series order fulfillment.  For 
more information, see How to get Windows Server IOT 
ISO File below. 

 

How to get the Windows Server 2019 IOT ISO File

 

 

1.

 

Customers that have validated the Arcserve orders can use the following link (always the same) from 
the order confirmation documents. The Product license key is a sticker on the delivered unit. 

 

https://forms.gle/rzEHMxGWptxn5n216

 

 

Содержание N Series

Страница 1: ...rcserve Appliances N Series Hardware Installation Guide for Lenovo Large HX5521 SR650 1 HARDWARE INSTALLATION GUIDE Arcserve Appliance N Series Hardware Installation Guide Lenovo Large Node HX5521 SR650 ...

Страница 2: ...1 Overview 3 2 Product Ratings 4 3 Site Preparation 5 4 Unpacking the Appliance 6 5 Installing the Appliance in a Rack 7 6 Front Panel Operation 8 7 Rear Panel Connections and Device Locations 11 8 System Administration with XClarity Administrator 12 9 Software Sources 14 10 Contact Support 16 11 Warranty 16 ...

Страница 3: ...nd serial number are located on the ID label on the front right rack latch The XClarity Controller network access label is attached on the top side of the pull out information tab New Nutanix Cluster running AOS N Series Component Four nodes in four 1U chassis Arcserve N Series Block Diagram Node 1 Node 2 Node 3 Node 4 Windows Server 2019 IOT N Series component Arcserve UDP 8 x with Sophos N Serie...

Страница 4: ...32 0 kg 70 6 lbs fully loaded with drives Heat output Approximate thermal design power is 205 watts 700 BTU per hour Electrical input Dual 1100 watt D2 Platinum Power supplies Sine wave input 50 60 Hz required Input voltage low range Minimum 100 V AC Maximum 127 V AC Input voltage high range Minimum 200 V AC Maximum 240 V AC Input kilovolt amperes kVA approximately Minimum 0 153 kVA Maximum 2 61 k...

Страница 5: ...mechanical loading ALL RACKS MUST BE MOUNTED SECURELY Ensure that all leveling jacks or stabilizers are properly attached to the rack If installing multiple appliances in a rack make sure the overall loading for each branch circuit does not exceed the rated capacity Do not slide more than one appliance out from the rack at a time Extending more than one appliance at a time may result in the rack b...

Страница 6: ...er cords rack installation template and accessory kit Software license numbers Customer Provided Items 19 rack with 2U per node of available rack space Power distribution unit outlets There are two power cords for the power supplies to connect to the redundant power sources within the rack cabinet CAT5 or better LAN cables GBICs for fibre or captive GBICs on twinax cables Network switch DNS networ...

Страница 7: ... or more people are required to install this device in a 19 inch rack cabinet Install the server in a rack that meets the following requirements Minimum depth of 70 mm 2 76 in between the front mounting flange and inside of the front door Minimum depth of 157 mm 6 18 in between the rear mounting flange and inside of the rear door ...

Страница 8: ...pushbutton push on push off power switch 1 Pull out information tab 2 Operator Info Panel see below 3 Rack latch right 4 3 5 inch form factor drive bays 5 Rack latch left 6 VGA connector 7 Drive activity LED 8 Drive status LED Slot 3 1 XClarity Controller USB connector 2 USB 3 0 connector 3 Power button with power status LED 4 Network activity LED 5 System ID button with system ID LED 6 System err...

Страница 9: ...compute node can be turned on power LED on in any of the following ways Press the front panel power button The compute node restarts automatically after a power interruption The compute node responds to remote power on requests sent to the Lenovo XClarity Controller Network activity LED Status Color Description On Green The server is connected to a network Blinking Green The network is connected a...

Страница 10: ...wing 1 The Lenovo XClarity Controller places the compute node in a standby state as an automatic response to a critical system failure 2 Start an orderly shutdown using the operating system if supported by your operating system 3 Press the power button s to start an orderly shutdown if supported by your operating system 4 Press and hold the front power button s for more than 4 seconds to force the...

Страница 11: ...icated network port 3 VGA connector 4 USB 3 0 connectors 5 NMI button 6 Power supply 1 7 Power supply 2 8 PCIe slot 5 on riser 2 9 PCIe slot 6 on riser 2 10 PCIe slot 4 11 PCIe slot 1 on riser 1 12 PCIe slot 2 on riser 1 13 PCIe slot 3 on riser 1 B C Slot 1 Rear View LEDs 1 System ID LED 2 Ethernet link LED 3 Ethernet activity LED 4 System error LED 5 Power input LED 6 Power output LED 7 Power sup...

Страница 12: ... For example https 192 0 2 10 ui login html 3 Type the following default username and password User name USERID Password PASSW0RD The username and password are case sensitive The o in password has been replaced with a zero The first time login requires a password change Passwords must meet the following criteria Must contain eight or more characters with at least one number 0 9 and one alphabetica...

Страница 13: ...Arcserve Appliances N Series Hardware Installation Guide for Lenovo Large HX5521 SR650 13 ...

Страница 14: ...t and operations for virtualized datacenter environments including administration reporting and system administration automation Log into the mynutanix com find the blue Launch button for the Support Portal select Downloads and then look for Prism Central Arcserve N Series Mine deployment Image Arcserve Nutanix Mine deployment image bundled with Arcserve Unified Data Protection UDP and LBS ISO Dow...

Страница 15: ...inistrator validates the request Within a two business day interval the system will generate an email to the customer provided address with a customer specific link The link of each customer is unique 5 The email recipient clicks the Open button to get to the blue Download button A free Google account login is required to see the Download button If not logged in one can provide the Google account ...

Страница 16: ...trademarks trade names service marks and logos referenced herein belong to their respective owners This document is for your informational purposes only Arcserve assumes no responsibility for the accuracy or completeness of the information To the extent permitted by applicable law Arcserve provides this document as is without warranty of any kind including without limitation any implied warranties...

Отзывы: