Step 1:
Prior to installation, make sure the quartz sleeve
and UV lamp are clean. It is advised to wear gloves (clean
with alcohol, if needed).
Step 3:
Install o-ring onto the open end of quartz sleeve
(1.5” from the edge of the open end of sleave).
Step 4:
Insert the quartz sleeve into the UV chamber.
IMPORTANT:
It is easiest to insert
sleave when chamber
is verticle.
Step 5:
Hand-screw end nut on the UV chamber. To protect
the o-ring, the nut should be snug but do not over-tighten.
Step 6:
Connect the UV lamp to the lamp socket.
Step 7:
Carefully insert the UV lamp into the quartz
sleeve through end nut.
Step 8:
Install the cover cap and hand-tighten onto end nut.
Step 9:
The system should always be located closest
to the point of use. The UV kit can either be installed
horizontally or vertically.
Step 10:
Slowly turn on the water supply and check
for leaks. Run water for 3 minutes before powering up
system.
Step 2:
Remove end nut from UV chamber
.
4.
UV Installation Assembly