background image

8

913F Powerig® Unit (HK1191)

        

                       

 

Maintenance

SPARE PARTS

Always keep spare parts on hand commensurate with the 

number of Powerigs in service. Parts that should be available 

to the service technician are: Pump-to-Motor Coupling, Relay, 

Transformer, Pilot Valve, and Motor Brushes. See 

Spare Parts 

and Accessories

  for part numbers. 

PREVENTIVE MAINTENANCE: 

Perform the following steps monthly during normal use:

•  Ensure that hydraulic and electrical fittings are secure.

  Inspect hoses for signs of damage. Replace hoses if abrasion 

is deeper than the surface texture.

  Inspect during operation to detect any abnormal heating, 

vibration or leakage.

•  Inspect hydraulic fluid. If contamination (particles, water, 

sludge, etc.) is detected, clean the reservoir and replace fluid. 

Replace return line filter when changing hydraulic oil.

•  Clean exterior surfaces.

DIRECTIONAL VALVE OVERHAUL

If overhaul of the directional valve is necessary, a valve repair 

kit that has the spools, cartridges & poppets is 129437, is 

available for purchase, and should be kept on hand. To rebuild 

valve, follow instructions included with kit. 

PUMP OVERHAUL: 

If pump requires overhaul return it, or the complete unit, to 

the nearest repair facility shown on the inside back cover.

ENGINE MAINTENANCE:

 

  Check the oil in the hydraulic unit every 5 operating hours, 

and before each use.

•  Change the crankcase oil after the first 20 hours of operation. 

Thereafter, change it after every 100 hours of operation. If 

the power source is operated in extremely dusty or dirty 

environment, change the oil every 50 hours of operation. SEE 

WARNING ABOVE. Unscrew the oil drain plug; tip the engine 

toward the oil drain hole and drain completely. Replace the 

oil drain plug and refill.

•  The air-cooled engine operates most efficiently when the 

cooling fins are kept clean. Remove all dust and dirt from 

the cylinder fins and the underside of the housing, as 

required.

  A dirty or clogged air cleaner results in noticeable loss of 

engine power. Clean the reusable-type of air cleaner every 

10 operating hours (more frequently if the unit is operating 

in dusty or dirty environment). To clean, remove the air 

cleaner and dip it in gasoline.

  Remove and inspect the spark plug at each oil change. Keep 

electrodes clean and free of carbon. Adjust electrode gap to 

.030 inch. If electrodes are pitted or burned, or the ceramic 

insulator is cracked, replace the spark plug. Before installing 

a spark plug, coat its threads 

lightly with graphite grease.

Notes:

1. Service more frequently 

when used in dusty areas.

2. These items should be 

serviced by Honda engine 

service dealer, unless you 

have the proper tools 

and are mechanically 

proficient. Refer to the 

Honda shop manual for 

service procedures.

3. Engine oil: use 5W30 (0°F - 

100°F ambient) or 10W-30 

(20°F - 120°F ambient).

4. Use Huck Return Oil Filter.

5. Hydraulic fluid: use 32AW 

(0°F - 70°F ambient), 46AW 

(30°F - 120°F ambient), or 

ATF (30°F - 90°F ambient).

6. Use Huck Breather Vent 

Filter.

7. If poppets show wear, use 

Huck Directional Valve Kit 

to replace poppets, seats & 

seals.

8. If valve stem shows wear, 

replace with Huck Valve 

Stem.

WARNING: Before changing the oil, 

DISCONNECT THE WIRE FROM THE SPARK 

PLUG. Failure to do so may result in severe 

personal injury and damage to the tool.

SERVICE PERIOD

ACTION

BEFORE 

EACH

USE

AFTER 

FIRST 20 

HOURS

EVERY

50

HOURS

EVERY

100

HOURS

EVERY

200

HOURS

Engine Oil

Check

Change

• (

3

)

• (

1

) (

3

)

Engine Air Cleaner

Check

Clean

• (

1

)

Replace

Spark Plug

Check-

Adjust

Replace

Engine Cooling Fins, Underside 

of Housing

Clean

Combustion Chamber

Clean

Engine Run Speed

Check-

Adjust

•(

2

)

Engine Valve Clearance

Check-

Adjust

•(

2

)

Fuel Tank and Fuel Filter

Check

• (

2

)

Hydraulic Hose Fittings

Check-Clean

Electrical Connections

Check

Hydraulic Fluid Level, Fill Cap 

Tight

Check

Verify Pull & Return Pressure, 

Tighten Adjustment Screw Jam 

Nuts

Check

Tighten Cover Plate Screws

Check

Tighten Screws on Engine

Check

Hydraulic Fluid Filter

Change

• (

1

) (

4

)

Change Hydraulic Fluid, Clean 

Tank

Change

• (

1

) (

5

)

Breather Vent Filter

Change

• (

1

) (

6

)

Directional Valve Seals, Poppets 

& Seats

Check

• (

7

)

External Relief Valve Stem

Check

• (

8

)

Содержание Powerig 913F

Страница 1: ... Hydraulic Power Source Safety Instructions 3 Description 4 Specifications 4 Troubleshooting 4 Principle of Operation 5 Electrical and Hydraulic Schematic Diagrams 6 Preparation for Use 7 Checking and Adjusting Pressures 7 Operating Instructions 7 Maintenance 8 Spare Parts and Accessories 9 Components Drawings 10 16 ...

Страница 2: ...2 913F Powerig Unit HK1191 ...

Страница 3: ...ting downtime and in preventing an accident which may cause severe personal injury 22 Never place hands between nose assembly and work piece Keep hands clear from front of tool 23 There is a risk of crushing if tool is cycled without Nose Assembly installed 24 Tools with ejector rods should never be cycled with out nose assembly installed 25 When two piece lock bolts are being used always make sur...

Страница 4: ...s Powerig includes a roll cage for protection as well as to facilitate moving the unit to various work stations The unit weighs approximately 175 pounds 79 379 kg when filled with hydraulic fluid Description WARNING RETURN pressure can be adjusted to 6000 PSI if required for use with HPT tools ONLY DO NOT OPERATE OTHER HUCK TOOLS AT THIS RETURN PRESSURE Severe personal injury and damage to tool ma...

Страница 5: ...is starting the pressure stroke As the piston is forced into the cylinder barrel pressure is developed in the pressure chamber R Intake valve L closes and the discharge check valve N is forced open delivering oil from the piston pump to the system which joins the oil from the gear pump at O FIGURE 2 When the pressure builds up to the setting of the spring P Approximately 600 psi pressure against t...

Страница 6: ...nd 505174 6 will be joined together with 104480 and grounded in one location inside the solenoid valve 130998 1 RS 1 130998 ON OFF Rocker Switch 130998 2 RS 2 130993 KS 1 Engine Kill Switch Lead Internal Relief Valve 9200 psi External Relief Valve PULL Pressure adjustment M H P L P L P Unloading Valve 660 psi Super Charge Relief Valve 200 psi Pilot Valve T B P A P B T A Directional Valve Kick down...

Страница 7: ...Be sure that 1 Hose from PULL PRESSURE on the control panel runs to the port stamped with a letter P on the tool 2 Hose from RETURN PRESSURE on the control panel runs to the port stamped with letter R on the tool Plug the control cable from the tool into the two prong socket on the Powerig Hydraulic Power Source Press the tool trigger switch and let the Powerig operate for a few minutes to circula...

Страница 8: ...ults in noticeable loss of engine power Clean the reusable type of air cleaner every 10 operating hours more frequently if the unit is operating in dusty or dirty environment To clean remove the air cleaner and dip it in gasoline Remove and inspect the spark plug at each oil change Keep electrodes clean and free of carbon Adjust electrode gap to 030 inch If electrodes are pitted or burned or the c...

Страница 9: ...AUXILIARY SWITCH AND CONTROL CORD 113056 An auxiliary switch is available for use when checking and adjusting pressures and when troubleshooting HOSE AND CONTROL CORD KITS of various lengths Please contact your HUCK representative PUMP REBUILD PARTS are recommended when the pump cannot build pressure normally and requires rebuilding Training assistance is available for rebuilding pumps PUMP REBUIL...

Страница 10: ... 500217 Hex Nut 110439 Female Coupler 504057 Hex Nipple Apply Parker Threadmate HUCK p n 508567 to threads per mfr instructions Tighten to finger tight condition first then wrench tight 2 3 turns more Kick down Relief Valve RETURN Pressure Adjustment Apply Parker Threadmate HUCK p n 508567 to threads per mfr instructions Tighten to finger tight condition first then wrench tight 2 3 turns more 5901...

Страница 11: ... Screw 2 508863 Dowel Pin 2 508796 Spacer 130998 ON OFF Rocker Switch 508795 Angle Bracket 508797 Lockwasher 2 508800 ON OFF Decal 500083 Cap Screw 3 Torque to 90 100 inch pounds 500170 Flat Washer 3 508851 Terminal Ring MOTOR GROUND 508867 Button Head Screw 2 508854 Loop Clamp 3 131310 Curved Cover with Hole 508864 Round Machine Screw 8 508865 Grommet 502467 Button Head Screw 2 130994 Hour Meter ...

Страница 12: ... to 90 110 inch pounds 103904 Drain Tube 508849 Elbow Note orientation 508850 Nipple 103599 Pull Return Manifold Torque this Screw to 80 100 inch pounds 508843 Dust Cover Plug 2 502729 Hex Nipple 504057 Hex Nipple 110438 Male Quick Disconnect 110439 Female Quick Disconnect 502402 Hex Reducing Bushing 508847 Straight Tube Connector 508859 Filter Tube 508693 Return Oil Filter 502728 Hex Nipple 50885...

Страница 13: ...ow 103900 Check and Relief Valve 508708 Valve Stem 508701 Spring 508710 Spring Guide 500778 O ring 508709 Valve Cap 500237 Nut 500138 Cap Screw 508717 Valve Knob 501084 Back up Ring 500778 O ring 508723 Cover Plate 500776 O ring 507544 Intake Screen 504711 O ring 504711 O ring 508719 Suction Line 508718 Straight Connector 130913 Basic Pump See Figure 9 500073 Cap Screw 3 1 4 20 500115 Cap Screw 2 ...

Страница 14: ...Ring 4 places 501082 Back up Ring 2 places 500776 O Ring 2 places 131150 Poppet 2 places 131152 Valve Piston 131149 Spool 4 places 508789 Spring 4 places 508791 Washer 4 places 500063 Cap Screw 500066 Cap Screw 8 places 131155 Valve Body 103599 Manifold 500076 Cap Screw 2 places 500778 O Ring 4 places 501084 Back up Ring 4 places 500778 O Ring 131151 Bushing 2 places 131153 End Cap Components with...

Страница 15: ...15 913F Powerig Unit HK1191 130913 Basic Pump Figure 9 130913_revB See Figure 10 ...

Страница 16: ...16 913F Powerig Unit HK1191 131295 Pump Barrel Assembly Figure 10 131295_revA ...

Страница 17: ...ar or as part of a complete overhaul Determination is made on a case by case basis upon return of parts to Huck International Inc for evaluation Tooling Part s and Other Items not manufactured by Huck HUCK makes no warranty with respect to the tooling part s or other items manufactured by third parties HUCK expressly disclaims any warranty expressed or implied as to the condition design operation ...

Страница 18: ...00 São Paulo SP Brazil Tel 55 11 3583 7061 Suzhou Operations 58 Yinsheng Road SIP Suzhou Jiangsu 215126 China Tel 86 512 62863800 8888 Telford Operations Unit C Stafford Park 7 Telford Shropshire England TF3 3BQ Tel 44 1952 290011 Fax 44 1952 207701 thisales arconic com Tokyo Operations Japan and Korea 1013 Hibiya U 1 Bldg Uchisaiwai cho 1 1 7 Chiyoda ku Tokyo 100 0011 Japan Tel 81 3 3539 6594 Fax...

Отзывы: