29
11. “N” ZONES SYSTEM CONNECTIONS
Company ARCA S.r.l. may supply an extra control board as an accessory for heating systems with 4 different
zones (cod.SCH0005C).
12. FIRING AND BURNING
Before proceeding to the boiler firing control the following:
a) The cast iron bars must be correctly inserted in their supporting hollow frame in the central part of the
wood collecting chamber bottom cement plate.
b) The catalyst elements must be correctly in place; it is especially important that:
the lower catalyst element is in touch with the bottom plate
the upper catalyst element is in touch with the lower door
c) The heating circuit must be filled with water and adequately bled from air
d) The closing valves must be opened, if any, and the pumps must not be blocked
12.1. FIRING
Close the lower door, then turn on the main switch 1. Put on the central part of the wood collecting chamber
bottom cement plate, on the cast iron grate, some dry and thin pieces of wood in a crossed pattern. Over the
wood put some easily flammable materials, avoid large and square shaped pieces. Using some thin paper
sheets (such as newspapers), light the wood. Immediately close the upper wood collecting chamber door.
When the upper wood collecting chamber door is open, the display shows “
BOILER DOOR OPEN”; when
closing the door, make sure that this message disappears.
Содержание ASPIRO A 29 R/SA
Страница 1: ...ASPIRO Installation Operation Maintenance www arcacaldaie com ...
Страница 2: ...2 ...