26
English
4. Position the filters as in the figure based on the
desired connection:
1
a - Open the front panel
2
3
F7
M5
F7
M5
b - remove the plugs from the filters
c - extract the filters and insert them based on the
chosen connection.
Standard Configuration
Right Side Configuration
The operations related to the connection
must only be carried out by qualified
personnel to avoid damage or injury.
The units equipped with integrated
electric resistance cannot undergo flow
configuration inversion. The machine
must be purchased with resistance in the left or
right side version depending on the envisaged
installation requirements
Содержание Sabiana Energy Smart Series
Страница 2: ......
Страница 22: ...22 English Installing controller on the wall 1 2 3 4 1 2 3 4 60 9 10 8 10 9 57 56 ...