background image

1 — INSTALL BRASS TEE FITTING

1

  Turn off the cold water supply to the sink.

2

  Turn on the kitchen faucet to release pressure and allow water to drain from the line.

3

  Disconnect the cold water line from the 1/2" threaded stem on the bottom of the kitchen 

faucet. Attach threaded ends of supplied brass tee to the cold water supply line and shut-off 
valve; tighten using an adjustable wrench.

4

  Attach 1/4" white tube to the brass tee: 

  A. Slide the compression nut onto the white tubing. 
  B. Slide the plastic sleeve onto the white tube. 
  C. Place brass insert into the opening of white tube. 
  D. Push the tip of the white tubing into the opening of the brass tee. 
  E. Slide the compression nut onto the threads of the brass tee.
  F.  While holding the white tube in place, tighten the compression nut to compress the plastic 

sleeve and create a seal. 

NOTE: 

Use a wrench to ensure complete seal. Avoid over tightening.

5

   Do not connect the other end at this time. 

1

   On the nipple on top of the tank, apply plumber’s 

tape 4 or 5 times clockwise around in the same 
direction as the threads.

2

   Hand tighten the tank connector onto the tank 

nipple until secure. 

NOTE: 

Do not cross thread or 

over tighten.

3

  Using mount stand, place tank near the system 

manifold. Measure 3/8" white tubing to the outlet 
side of the system manifold and ensure you 
have enough tubing to connect tank and system 
manifold as well as enough left to attach faucet 
stem and remineralizer. Cut 3/8" white tubing.

Stage 2

RO Membrane

AQ-RO3-RO

OptimH2O™

OptimH2O™

A

B

C

D

E

F

OptimH2O™

OptimH2O™

OptimH2O™

OptimH2O™

OptimH2O™

OptimH2O™

OptimH2O™

A

B

C

2

1

2 — INSTALL SYSTEM MANIFOLD

  Select an easily accessible area under the sink to mount system 

manifold and remineralizer holder. You want to allow at least a 4 
to 6 inch clearance below the filters to the floor to allow ample 
space for filter changes. To help gauge the right location for your 
system manifold, insert first and third stage filter sumps into 
manifold. Insert sumps by aligning top connection points and 
push up and to the right until sumps are locked in. 

2

  Mark wall placement for mounting screws using 

built-in bracket on back of manifold. Make sure holes 
are as level as possible. Mark screw placement of 
the remineralizer holder 1 or 2 inches from the third 
stage sump to the right of the manifold. 

 Drill two pilot holes for mounting brackets using 1/8" 
drill bit for the system manifold.  

NOTE: 

Use caution 

not to drill into anything beyond the cabinet wall.

4

  Insert mounting screws into the wall leaving approximately 3/8" of each screw exposed.

5

   Remove first and third filter sumps from manifold by turning each sump to the left and 

pulling down before hanging manifold on wall. Mount manifold on wall and screw in. Be 
careful not to over tighten.

6

   Screw in remineralizer holder onto wall.

4

  Install the 3/8"  white tubing to the tank:

 

A.  

Push the tubing through the nut, collar and sleeve into the connector.

  B.  

Unscrew the compression nut from the tank connector to ensure that the tubing is 
connected all the way through the collar and sleeve.

  C.  

Slide the nut to the threads and tighten with a wrench. Avoid over tightening.

3 — INSTALL WATER STORAGE TANK

Содержание OptimH2O AQ-RO-3

Страница 1: ...ter technology is working for you System tested and certified by NSF International against NSF ANSI Standard 42 53 401 and conforms to NSF protocol P473 for reduction of claims specified on the Perfor...

Страница 2: ...aucet hole to ensure there will be enough 3 8 tubing available for both connections Wait to cut tubing and follow instructions below 4 Remove system remineralizer and tank from under your sink to begi...

Страница 3: ...RO3 RO OptimH2O OptimH2O A B C D E F OptimH2O OptimH2O OptimH2O OptimH2O OptimH2O OptimH2O OptimH2O A B C 2 1 2 INSTALL SYSTEM MANIFOLD 1 Select an easily accessible area under the sink to mount syste...

Страница 4: ...cet 5 INSTALL RO DRAIN CONNECTOR WARNING CAUTION Be sure that all electrical appliances and outlets are turned off at the circuit breaker before working in the cabinet area Please wear safety glasses...

Страница 5: ...Membrane red tubing from faucet 1 Insert restrictor into the end of the red tubing 2 Attach red tubing to the 90 elbow until it stops 3 Attach 90 elbow to the membrane drain port VI Faucet to Drain C...

Страница 6: ...ing end If there are squarely cut 1 off and re insert Note When RO Filter System is first pressurized water may project from faucet air gap hole until air is passed from RO Filter System Purge 1 Open...

Страница 7: ...the scaling and fouling tendencies of the Feed Water 2 Measured at 50 psi 77 2 F and 717 mg l TDS per NSF ANSI Standard 58 3 Efficiency rating means the percentage of the influent water to the system...

Страница 8: ...y filled flush saturate the remineralizer cartridge by opening up the filter faucet and allowing the purified water to run through the remineralizer for 3 minutes The water may come out cloudy during...

Страница 9: ...oroethylene 0 007 0 083 0 001 99 cis 1 2 dichloroethylene 0 07 0 170 0 0005 99 trans 1 2 dichloroethylene 0 1 0 086 0 001 99 1 2 dichloropropane 0 005 0 080 0 001 99 cis 1 3 dichloropropylene 0 079 0...

Страница 10: ...hibit the exclusion or limit of incidental or consequential damages so the above limitation or exclusion may not apply to you WARRANTY CARD Warranty registration is not required for coverage under the...

Страница 11: ...s to NSF protocol P473 for reduction of claims specified on the Performance Data Sheet and at nsf org The AQ RO 3 system has been tested and certified by NSF International against NSF ANSI Standard 58...

Отзывы: