Quartz Digital Concealed
installation instructions
Page 13
Re-instate the electricity supply to the processor. Press the ‘start/stop’ button on the
controller to turn the shower on. The processor will start in the highest flow rate or
‘boost mode’. Press the ‘boost’ button to revert to the ‘normal’ flow rate. The
processor will now provide both ‘normal’ and ‘boost’ modes.
18
Run the shower at maximum temperature
(factory pre set to 45
0
C). If required,
maximum temperature adjustment can be
made with a flat bladed screwdriver using the
‘MAX’ TEMP ADJUSTMENT’ control as
indicated. When the temperature has been set
to the desired position carefully replace the
Digital processor lid and secure the fixing hand tight only.
19
Site conditions can affect temperature settings, installer to adjust as required.
ALL COPPER PIPE WORK MUST BE CROSS-BONDED AND CONNECTED TO A
RELIABLE EARTHING POINT.
!
Prepare two fixing points 642mm-655mm
vertically apart using a spirit level to facilitate
if necessary. Fit the rail end clip into position
and loosely fit the lower bracket into position.
Pass the rail through the handset holder
whilst keeping the slider levers depressed
with the handset holder pointing in a
downward direction.
Carefully slide the gel hanger onto the rail
under the handset holder.
2
Adjustable height head
F
1