STAC2
- 64 -
11
STAND-BY & STORAGE PROCEDURE
1/ Install all
Sample’s tubes, in the rinsing liquid pot.
2/ Do 4 measurement
’s cycle process with enabled rinse and all samples option. (Sample’s
tubing will be cleaned by the rinse solution)
3 Stop the instrument.
4/ Disconnect it from the power supplies.
5/ Remove all the silicon tubes out of the electro-valves
6/ Remove the silicon tube out of the peristaltic pump head.
7/ Be careful to remove, avoid and clean any liquids projection or leak inside and over all
instruments parts, before closing it completely.
NOTE:
STAC not used during a long time
- Empty completely the tube and flow-through cuvette.
- Clean and dry the flow-through cuvette.
- Installed the equipment in dry and clean place.
- Set the storage temperature between 10 and 40°C
Содержание Secomam STAC2
Страница 1: ...USER MANUAL version 1 03 ON LINE ANALYZER ...
Страница 2: ...STAC2 2 INSTALLATION USER S MANUAL ...
Страница 5: ...STAC2 5 ...
Страница 7: ...STAC2 7 ...
Страница 11: ...STAC2 11 ...
Страница 13: ...STAC2 13 ...
Страница 14: ......
Страница 27: ......
Страница 31: ......
Страница 59: ...STAC2 59 ...
Страница 65: ...STAC2 65 ...
Страница 74: ......