10
HC100/N/240717/NW
Disclaimer
The information included in these tables has been obtained from highly qualified
sources which we deem reliable and they are provided without any guarantee, explicit
or implicit, concerning their exactness.
Conditions or methods for handling, storage and use of the material are beyond our
control and/or knowledge.
For this reason and for other reasons we will not be held liable thereof and we
expressly waive obligations of claim for damages or relating to the information
contained herein.
WARRANTY CERTIFICATE
The pumps are warranted to be free from defects in work manship and material for 12 months of
operation starting from the delivery date to the first purchaser.
Within the above stated period the producer will supply free of charge any part that upon examination by
the producer or by an authorised dealer, is disclosed to have been defective in work manship or material,
or at its option, it will repair the parts directly or through authorised workshops It remains anyway
excluded from whatever responsibility and obligation for others costs, damages and direct or indirect
losses that come from the use or the not use availability, either total or partial.
The reparation or the supply in substitution will neither extend nor renew the period of guarantee.
They
remain anyway at charge of the purchaser the costs of plant pumps mounting and disassembling,
transport cost and using materials (filters, valves, and so on).
Producer’s duties, as above, are not valid when:
The pumps are not used according to the producer instructions as in the operating manual
and maintenance instructions;
The pumps are repaired, disassembled, modified by workshop not authorised;
They have used not original spare parts
The injection plans are damaged buy products that are not suitable;
The electric plants have been damaged because of external causes such as whatever type
of over tensions.
AT THE END OF THE TWELFTH MONTH FROM THE DELIVERY DATE, THE PRODUCER WILL BE FREE FROM
ANY LIABILITY AND FROM ALL THE DUTIES AS ABOVE!
ENGLISH
ENGLISH
Содержание HC 100
Страница 1: ...1 OPERATING AND MAINTENANCE INSTRUCTIONS HC 100 ...
Страница 12: ...11 HC100 N 240717 NW Fig 1 HC 1 WALL MOUNTING Fig 2 HC 1 BASE MOUNTING ...
Страница 13: ...12 HC100 N 240717 NW Ball valves Lip valves Fig 3 4 PUMP HEAD TUBING CONNECTIONS Purge Valve Hose clamp ...
Страница 14: ...13 HC100 N 240717 NW Fig 5 Pump parts drawing ...
Страница 16: ...15 HC100 N 240717 NW ...
Страница 19: ...18 HC100 N 240717 NW NOTES ...