CHAPTER 4
OPERATING INSTRUCTIONS
Entire Contents Copyright
2006
by Adaptive Power Systems, Inc. (APSI) • All Rights Reserved • No reproduction without written authorization from APSI.
FC200 SERIES OPERATIONS MANUAL
4 - 2
FC200-000-02.2
Basic Operation
System Information
When the power is turned ON, the front panel momentarily displays:
The model number, in the VOLTAGE display.
The installed firmware version number, in the CURRENT display.
Overview of Capabilities
System parameters are identified and explained in this chapter. This overview is
provided to give you an idea of capabilities. You must read and study this chapter to
understand how to effectively and safely use the FC200.
When the unit is turned ON, but the output power is OFF, you can manually set
values for Voltage, Frequency, and Current. When you begin a test (output ON), the
selected values will be output to the connected load.
During a test, you can make changes to the values being output. Alternatively, you
can lock the front panel controls, so values will not accidentally be changed.
In addition, you can store up to three different sets of voltage, frequency and current
parameters in memories M1, M2 or M3. You will be able to manually recall these
stored values. Or, you can use an external interface controller (typically a
PLC)(optional), to execute the stored programs. During a manual or PLC-managed
test, you can switch between the stored programs using M1, M2, or M3.
System Parameters: Displays and Controls
To operate the FC200, you should become thoroughly familiar with the front panel
displays, controls, and indicators. Once you understand the basics, you will be able to
concentrate on testing. Chapter 3 provided summary information about displays and
controls. More in-depth information follows, about:
Voltage (Display) Setting
Frequency (Display) Setting
Current (Display) Setting
Power / PF (Display) Setting