4.4 PREPARATIONS FOR ASSEMBLY
The assembly of the operator requires a series of preliminary
operations on the door to be carried out directly on the site, if
the door has already been fi tted. It is therefore necessary to
prepare the necessary tools required by the fi tter.
Information
The list of tools required is shown in the fi gure, and in
the table, (
fi g.9
).
Basic tools and materials required
•
lectric disk grinder: 230V.
• Protective
goggles
• Electric
welder:
230V./100
Amp.minimum
• Protective
mask
• Electrodes
min.
dia.
2
• Soft-solderer
• Electric
drill
Power supply: 230 V.
• Drill
bits
•
Hollow mill dia. 67 for holes to house photocells and
pushbuttons
•
Extension cable for electrical equipment
•
Electric cable, section 1.5 mm2, various various
cable terminals
• Electrician’s
scissors
•
Pliers for cable terminals
• Tester
•
Gauge indicating hundredths
• Rule
• Protractor
• Dynamometer
• Plumbline
• Spirit
level
(three-dimensional)
• Graphitized
grease.
•
Can of Zincospray
• Rustproof
paint
• Paint
brushes
•
Paint thinner for cleaning brushes
• Metal
brush
• Various
fi
les
• Iron
saw
• Scoring
bits
• Hammer
•
Steel and masonry chisel
• Cleaning
tissues
• Paper
towels
• “First
Aid”
box
• Clamps
or
“grip”
grippers
2
2
1
1
AP024-8
Fig.9
Preliminary operations
Pos. Tool
Combination wrench 8
1
Allen key 3
2