
APACHE 50 PAGE # 4
Dawson’s
APPROACH E GI EERI G
AH-64A 50 MECHA ICS
6.7
Assemble the control horn as shown below.
6.8
Punch out the two VF-4 bell crank supports. Glue one VF-
4 to each side of the Depending on which side the bell crank is
on double up the support by adding another VF-5 on inside
surface, and two VF-5 1/8” light ply doublers on the outside
surface.
6.9
Put the bell crank with the boss to the side of the mount.
Slide the 5/32” brass sleeve into the mount and position the
3/16” brass sleeve as a spacer. Glue the outside of the 5/32”
tube on both ends to secure in place.
6.10
Attach the pushrod to the tail rotor bell crank making
sure that the arm is perpendicular to the pushrod.
6.0 VERTICAL FI FRAME
ASSEMBLY
otes:
Clevis
5/32” Brass Sleeve
3/16 Brass Sleeve
Bell crank
VF-5
VF-5
VF-5
5/32” Brass Sleeve
3/16 Brass Sleeve
VF-4