CSPP Capacitor Charging Unit Operation Manual
CSP-CSPP-8000/2
_________________________________________________________________________________________________________
__________________________________________________________________________________________________________
Page
3
of
59
Table of Contents
SECTION 1 - OPERATIONAL
1. Environmental Considerations
5
2. Introduction
6
3. Installation
7
4. Operation
14
5. Operator Controls and Indicators
17
6. End of Life Recycling / Disposal
21
7. Specifications
22
SECTION 2 - TROUBLESHOOTING
1. Introduction
25
2. Circuits and Descriptions
26
3. High Voltage on Circuit
31
4. Repair & Fault finding on CSP Power Supplies
33
5. CSP Basic Fault Diagnosis
34
6. Troubleshooting Guide
37
7.
Changing a Thyristor „Module‟ in the Field
40
SECTION 3
– CIRCUIT AND BLOCK DIAGRAMS
1.Introduction
43
2.Circuit and Block Diagram Index
43
Thank you for choosing Applied Acoustic Engineering as one of your subsea equipment suppliers.
We hope you experience many years of reliable operational use from our products.
If you do encounter any technical issues with any of our products then please don‟t hesitate to
contact our Technical Team via the following methods.
Tel:
+44 (0)1493 440355
Fax:
+44 (0)1493 440720
Email: [email protected]
Applied Acoustic Engineering Ltd has made every effort to ensure that the information contained in this
manual is correct at time of print. However our policy of continual product improvement means that we
cannot assume liability for any errors which may occur.
These written instructions must be followed fully for reliable and safe operation of the equipment that
this manual refers to. Applied Acoustic Engineering Ltd cannot be held responsible for any issues
arising from the improper use or maintenance of equipment referred to in this manual or failure of the
operator to adhere to the instructions laid out in this manual. The user must be familiar with the
contents of this manual before use or operation.