![Applent Instruments Anbai AT510 Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/applent-instruments/anbai-at510/anbai-at510_user-manual_2954870006.webp)
6
AT510x DC Resistance Meter
1.
Unpacking
and
Inspection
This chapter provides the following information:
Packing List
Power Supply
Setup Fuse
Operating Environment
Cleaning
How to Remove the Handle
1.1
Packing
List
After you receive the instrument, carry out checks during unpacking according to the
following procedure.
1.
Check that the packing box or shock-absorbing material used to package the
instrument has not been damaged.
2.
Referring to Table 1-1, check that all packaged items supplied with the meter have
been provided as per the specified optioned.
Table1-1 Included Accessories
NAME
QTY
REMARK
User’s Manual
1
AC Power Cord
1
Fuse 2
0.5A
Slow-Blow
Kelvin Test Leads
1
ATL501
Test Report
1
Product & Warranty Certification
1
1.2
Power
Supply
Confirm that the power supplied to the AT510x meets the following requirements:
Voltage
:
198-252V AC
Frequency
:
47.5-66Hz
Consumption
:
< 15VA
:
WARNING
The ground wire should be earthed to avoid being electric shock.
If you change the power cord, make sure the ground wire earthed.
Содержание Anbai AT510
Страница 27: ...Specification 27 6 5 Dimensions ...