22
The pages below can be used as an inspection protocol.
Sheet 1 of 2
Client/ Medical Centre/ Surgery:
Address:
Task carried out: Testing of the bed
Testing before the first use of the bed
_____________________________________________ Testing after repair / maintenance
Device type: Nursing Bed
Protection class: I
Bed type:
Inventory number:
Place:
Serial number:
Manufacturer: Apollo Healthcare Technologies Ltd.
Parts used: none
Equipment used (Type/ number of inventory):
1.
Classification according MPG: class I
2.
I. Visual inspection
ok
not
ok
Problem
description
Visual inspection of electrical components
Identification labels and stickers
In place and clearly readable
Housing of the control device
Properly positioned, damages
Housing and lifting tubes of the
motors
Properly positioned, damages
Hand control
Damages
Power cable of the motors, hand
control cable
Properly positioned, damages
Connector and clamp of the
controller
Properly positioned
Visual inspection of mechanical components
Identification labels and stickers
In place and clearly readable
Lifting Pole
Damages, deformations
Bed frame
Damages, deformations
Wooden slats
Damages, wooden chips
Wheels
Damages
Mattress base
Damages, deformations
Wooden panels
Damages, wooden chips
Welding
Welding problems
Bed rail bars
Damages, wooden chips