9
IMPORTANT REMINDERS:
1. Make sure the equipment is placed on a flat stable surface
and all the heat-generating components placed on their
respective holders or stands.
2. Ensure all function switches are OFF prior to reworking.
3. Ensure all terminal connections are properly secured.
IMPORTANT:
Please refer to the
CONTROL PANEL GUIDE
page for buttons and display panel directory.
OPERATING GUIDELINES
E. INITIAL PROCEDURES
1. Plug the device to the main power source using the power cord
provided in the package.
2. With all function switches deactivated and all terminal connections
properly secured, switch ON the device by activating the main
power switch.
3. The display panel “B1” will temporarily show the product name in a
scrolling manner and then display “OFF” once the scroll is finished.
The system will remain at this state until the user activates a
function.
F. HOT AIR GUN
1. Follow the initial procedures above, “A. INITIAL PROCEDURES”.
2. Activate “Hot Air Gun” switch (“B4” from the control panel).
3. The system will immediately start to blow air and increase the air
temperature according to the set values of knob “B6” for airflow
and 100 degrees default set temperature. These values will be
reflected from the Hot Air Gun Air Temperature display “B1” and
Air flow gauge “B5”.
4. Adjust the air flow level using the airflow adjustment knob (“B6”
from the control panel).