8
A. Main Station
As soon as the equipment has been removed from the package,
REMOVE THE SCREW located at the center of the bottom of
the main unit. This screw holds the pump in place during
transportation.
B. Soldering Iron
1. Connect the soldering iron cord assembly to the soldering iron
output terminal .
2. Attach the sponge plate (A) to the side of the unit (B).
3. Place the soldering iron to the soldering iron stand.
4. Attach soldering iron spring holder as seen.
5.
C. Soldering Iron Stand
D. Hot Air Gun
The Hot Air Gun holder was installed on the station upside down
for packaging purpose. To set up the Hot Air Gun holder:
1. Loosen the two screws that secure the holder to the station.
2. Turn the holder right side up.
3. Re-fasten the two screws.
4. Place the hot air gun onto the holder in preparation for usage.
ASSEMBLY and PREPARATIONS
WARNING:
Failure to remove the screw before using the
equipment can cause damage to the system.
①
③
②