background image

10 

OPERATING PROCEDURES 

4. 

Press  the  increase  or  decrease  button  to  adjust  the  bottom  heater  set 

temperature level. The set temperature is adjustable from 50 to  280 C in this 

type of  operation.   To  temporarily turn off  the bottom  heater  simultaneously 

press both the “Increase” and “decrease” button

 (

#3 

&

 #4 

from the control 

panel display see page 8)

. The bottom display will show “OFF” indicating the 

bottom heater is now turned off. 

5. 

To  view  the  actual    internal  temperature  read  by  the  Top  heater  and  the 

bottom  heater’s  internal  temperature  probe,  repeatedly  press  the    selection 

button until the top display shows the actual value of the  top heater internal 

temperature followed by a suffix “

d

”. The number displayed in the middle row 

followed by a suffix

 “E” 

is for the bottom heater actual internal temperature

The bottom display shows the actual temperature of the soldering iron , it is 

followed by a suffix “

F

”. 

6. 

To  view  the  actual  temperature  read  by  the  three  external  temperature 

sensor, repeatedly press the  selection button until the top display shows the 

top  heater  external  temperature  prob’s  actual  temperature  followed  by  a 

suffix

  “A”

.  The  middle  display  will  show    external  temperature  probe  b’s 

actual  measured  temperature  followed  by  a  suffix

  “b”. 

And  the  bottom 

display  would  show  the  actual  measured  temperature  of  the  external 

temperature

 probe C

. It is followed by a suffix

 “C”. 

Note: External temperature probes are labeled.  Top heater external probe 

is labeled A, while the other two is labeled b and C. The displayed  actual 

temperature reading’s suffix corresponds to  the labels. 

E.  TYPE “1”  OPERATION 

Before  proceeding  with  this  type  of  operation,  attach  the  top  external 

temperature

 probe  A 

to one corner of  the BGA or IC to be reworked. Then attaché 

the external temperature

  probe  b 

to the underside of the PCB to be worked on, 

preferably  not    near  the  are  of  the  BGA  or  IC  to  be  reworked  on  but  not  directly 

underneath the BGA or IC.. The external  temperature

 probe  C 

can be placed near 

any area of interest.

 

LEGEND: 

1 — Digital Display 

7 — Solder Iron Connector 

1.a Top Display 

8 — Main Power Switch. 

1.b Middle Display 

9 — Power Cord. 

1.c Bottom Display 

10 — Fuse Holder. 

2 — Selection Button 

11 —  Top Heater Power Cord 

3 — Increase Button/ Enter Button 

12 —  Top Heater Sensor Connector 

4 — Decrease Button 

13 —  Top Heater Power Connector 

5 — Status LED 

14 —  Top Heater Sensor Cord 

6 — External Sensor Connector 

15 —  Top Heater External Sensor 

***

(Expansion for future versions, May not be available for current releases )

16 —  Lamp Attachment.*** 

Suffix guide: 

A - 

Actual Temperature of Sensor “A” / Set Temperature of Top Heater. 

b - 

Actual Temperature of  Sensor “b” / Set Temperature of Bottom Heater. 

c - 

Actual Temperature of Sensor “c”.

 

D - 

Actual Temperature of Top Heater Internal Sensor.

 

E - 

Actual Temperature of Bottom heater Internal Sensor.

 

F - 

Set/Actual Temperature of Solder Iron.

 

1.a 

Front Panel 

Back Panel

 

11 

12 

1.b 

1.c 

10 

13 

14 

15 

16 

CONTROL PANEL GUIDE 

Top Heater

Содержание Int732

Страница 1: ...LAY AND OTHER DEVICE OPERATION ISSUES SOLUTION Turn off power and back on OTHER PROBLEMS NOT MENTIONED Contact the vendor AOYUE TONGYI ELECTRONIC EQUIPMENT FACTORY Jishui Industrial Zone Nantou Zhongs...

Страница 2: ...6 SPECIFICATIONS 6 OPERATING PROCEDURES 7 15 BASIC TROUBLESHOOTING GUIDE 16 15 OPERATING PROCEDURES To check the slope from segment Two 150C 180C 30C Time to reach 150C is set to 110seconds Therefore...

Страница 3: ...reloaded Profile 0 SEG1 SEG2 SEG3 SEG4 SEG5 SEG6 090t 110t 150t 050t 060t 60t 150C 180C 210C 190C 210C 230C Segment one is set to 50 seconds to reach 150C Which means after 50seconds at the end of seg...

Страница 4: ...te During segments 1 3 the top heater heats up to 75 of the set temperature at these segments This is to allow a faster ramp up in preparation for reflow for segments 4 6 1 To enter type 2 operation S...

Страница 5: ...at the temperature set at segment 3 Then the last three segments utilizes the top heater to provide the final 25 of the heat to reach reflow 5 FUNCTIONS and FEATURES Multi Point Board Holder Innovativ...

Страница 6: ...button repeatedly until the top display shows TOP and the middle display shows SEt The bottom display would show the current set temperature of the top heater followed by a suffix A 2 Press the incre...

Страница 7: ...y a suffix C Note External temperature probes are labeled Top heater external probe is labeled A while the other two is labeled b and C The displayed actual temperature reading s suffix corresponds to...

Страница 8: ...rature is adjustable from 200 to 480C 3 For the solder iron actual temperature display Follow TYPE 0 OPERATION number 5 see page 10 4 To temporarily turn off the solder iron Simultaneously press both...

Отзывы: