
49
F
F
o
o
r
r
t
t
r
r
e
e
s
s
s
s
9
9
5
5
0
0
0
0
/
/
9
9
3
3
0
0
0
0
O
O
n
n
l
l
i
i
n
n
e
e
M
M
a
a
n
n
u
u
a
a
l
l
H
ousing
In
structi
o
n
Open
A
1.5.1 Installing a HSC5 Hot-Swap Cage
To install the hot-swap cage into the housing:
1.
Open the front panel door and remove the side panels. See “
Opening the housing panels
” on
page 38 for more information.
2.
Attach two pairs of drive rails on each side of the hot-swap cage. Secure the rails with eight
screws.
3.
Insert the hot-swap cage into the drive bays and secure the hot-swap cage with four screws.