ANTTI PLUG&DRY ................................................................................................................................................4
SELECTING LOCATION FOR THE DRYER .......................................................................................................... 4
FOUNDATION ........................................................................................................................................................4
THE SPACE REQUIRED FOR THE INSTALLATION ............................................................................................. 5
PRESENTATION OF THE MACHINE ....................................................................................................................5
SAFETY ..................................................................................................................................................................6
INSTALLATION OF THE ANTTI PLUG&DRY ........................................................................................................ 6
Principle drawings of different dryer types with accessories
.................................................................................. 8
Installing the electric cabinet and the bracket for the frequency transformer
...................................................... 11
Principle drawing of the cable routing
...................................................................................................................12
Unit-specific cabling
.............................................................................................................................................13
Example of connector IDs ....................................................................................................................................14
Electric installations ..............................................................................................................................................15
Installation ............................................................................................................................................................16
Installing the LTM thermostat
...............................................................................................................................16
Installing the temperature transmitter and the fire thermostat in the axial blower
................................................ 17
Installing the vacuum sensor
................................................................................................................................19
Installing the upper limit sensor (Capacitive, adjustable)
..................................................................................... 20
Installing the temperature transmitter in the duct
................................................................................................. 21
Installing the fire thermostat in the duct
................................................................................................................23
Piping the heaters with a grain pocket
..................................................................................................................31
Dimensioning of the basic parts viewed from the side
......................................................................................... 32
Dimensioning of the basic parts with a small intake pit viewed from above
......................................................... 33
Principle dimensioning drawings for the 10 m³ and 17m³ intake pits
................................................................... 34
Dimensioning of the intake pit to be used with a chain conveyor
......................................................................... 35
Installing the base and the legs
............................................................................................................................36
Sections, air channel ends
...................................................................................................................................36
Top tanks and cover with handrails
......................................................................................................................36
Installing the elevator and the ladder
....................................................................................................................37
Bolt-assembled hopper 10m³ / 17m³
....................................................................................................................37
The intake pit with Skandia conveyor
...................................................................................................................37
Wire control of the 3-way divider
..........................................................................................................................38
Fuel pipes .............................................................................................................................................................47
Installing the debris piping for the pre-cleaner
...................................................................................................... 47
STARTING UP ......................................................................................................................................................48
Elevator
................................................................................................................................................................48
Pre-cleaner ...........................................................................................................................................................48
Feeder .................................................................................................................................................................49
Blower...................................................................................................................................................................49
Burner ...................................................................................................................................................................49
LTM thermostat
.....................................................................................................................................................49
CONTENTS
Translation of original
Содержание Plug&Dry
Страница 10: ...Antti Teollisuus Oy 10 408116 03 2020 ...
Страница 13: ...Antti Teollisuus Oy 13 408116 03 2020 yellow green red yellow black Unit specific cabling Cable ladder ...
Страница 18: ...Antti Teollisuus Oy 18 408116 03 2020 ...
Страница 22: ...Antti Teollisuus Oy 22 408116 03 2020 ...
Страница 30: ...Antti Teollisuus Oy 30 408116 03 2020 ...
Страница 32: ...Antti Teollisuus Oy 32 408116 03 2020 Dimensioning of the basic parts viewed from the side ...
Страница 34: ...Antti Teollisuus Oy 34 408116 03 2020 Principle dimensioning drawings for the 10 m and 17m intake pits ...