2-3
VNA Return Loss Verification
Performance Verification
2-4
PN: 10580-00195 Revision B
S312D MM
2-3
VNA Return Loss Verification
The following test can be used to verify the accuracy of return loss measurements. Measurement calibration of
the Site Master is required for this test.
Required Equipment (refer to
):
•
Site Master S312D
•
Open/Short, Anritsu Model 22N50
•
50 ohm termination, Anritsu Model 28N50-2
Procedure:
1.
Press and hold the
ESCAPE/CLEAR
key, then press the
ON/OFF
key to turn on the Site Master. (This
sets the instrument to the factory preset state.)
2.
Press the
MODE
key.
3.
Use the
Up/Down
arrow key to highlight
Return Loss
, then press
ENTER
.
4.
Press the
START CAL
key.
5.
Follow the instructions on the screen to perform a calibration using a 22N50 Open/Short and
28N50-2 Termination.
6.
Connect the 20 dB offset to the RF Out port and record the minimum and maximum values in
“VNA Return Loss Verification” on page A-2
7.
Connect the 6 dB offset to the RF Out port and record the minimum and maximum values in
.
Figure 2-2.
VNA Return Loss Verification Test Setup
28N50-2
S312D
22N50
SC5270
SC5237
HOLD
RUN
START
CAL
AUTO
SCALE
SAVE
SETUP
RECALL
SETUP
LIMIT
MARKER
SAVE
DISPLAY
RECALL
DISPLAY
SYS
ENTER
CLEAR
ESCAPE
ON
OFF
1
2
4
5
6
7
8
0
9
3
MODE
FREQ/DIST
AMPLITUDE
MEAS/DISP
SiteMaster
S332D
Site Master
1
Содержание Site Master S312D
Страница 2: ......
Страница 10: ...1 4 Replaceable Parts General Information 1 4 PN 10580 00195 Revision B S312D MM ...
Страница 48: ...3 7 RTC Battery Information Removal and Replacement 3 8 PN 10580 00195 Revision B S312D MM ...
Страница 58: ...Test Records A 10 PN 10580 00195 Revision B S312D MM ...
Страница 60: ...Test Fixture Schematics B 2 PN 10580 00195 Revision B S312D MM ...
Страница 61: ......