ANITA ©
Serie GZ-539
33
Picture 34
11.11.
Thread puller
Requirement
In its neutral position thread puller 1 should:
1.
be positioned in the middle between A and B.
2.
have a clearance of 1 mm to plate 4 and 8 to 12 mm under latch 5.
3.
have a clearance of at least 1 mm to thread 6.
•
Adjust connecting rod 1 (nut 2) in accordance wity Requirement
1.
•
Only loosen screws 3 slightly.
•
Adjust bearing plate 4 in accordance with Requirement 2.
•
Tighten screw 3.
Cutting test:
•
Remove bearing plate 4 and carry out a cutting test with a
double thread.
•
Adjust the cutting pressure by turning screw 6.
•
Fit bearing plate 4.
Содержание GZ-539-407
Страница 2: ...ANITA Serie GZ 539 2...
Страница 39: ...ANITA Serie GZ 539 39...