![Andover Controls InfiLink 200 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/andover-controls/infilink-200/infilink-200_installation-manual_2942452007.webp)
InfiLink 200 Installation Guide
3
Power Requirements
Warning
Be sure your installation complies with local, state, and national
electrical codes.
Caution
The InfiLink 200 should receive power from its own independent,
unswitched circuit.
InfiLink 200 requires 120 V +10/–15%, 60 Hz. You can select 230
VAC, 50 Hz for European sites by setting two jumpers, but for smoke
control applications, you must use 120 VAC +10/–15%, 60 Hz.
You select the input voltage. When you receive it, it is set to 120 V.
Instructions for altering the input voltage are included later in this
manual.
Building Ground Requirements
Warning
Be sure that all hardware from Andover Controls Corporation is
grounded to true earth ground. This kind of ground protects the
equipment from lightning strikes and other power surges in the area.
Technical Manuals Online! - http://www.tech-man.com
firealarmresources.com