background image

6

Directions for Squaring the Tent

(see the diagram above)

1.  Locate the four primary corners.

a.  Using a tape measure, mark Points A & B (the width of the pavil-
ion fi rst.

b.  Using one tape measure,  start from point B and measure the 
length of the tent.
c. Using a second tape measure, start from point A and measure the 
diagonal.

d.  Mark the point at which these two tapes intersect.  (Point C)  This 
will square the tent.

e.  Using the same process, mark point D.

2.  Locate points for inter-
mediate uprights. 
 

a.  Using a tape mea-

sure running from points A 
to B, mark for end uprights 
(only on frames over 20’ 
projection).  
b.  Using a tape measure 
running from points B to 
C (or A to D) mark for side 
uprights according to your 
particular pavilion. 

These markings will be 
your guideline for tent 
layout.

PLAN VIEW OF 3 BAY STRUCTURE

(22’ Projection shown)

Upright centered on 
end required only 
on structures above 
20’ projection.
(2) Hole Base Plate 
required at this 
position only.

LAYOUT DIMENSIONS

Pavilion Size

“A” Dimension

“B” Diagonal Dim.

12’ Projection x 30’

12’-6 15/16”

32’-6 3/8”

14’ Projection x 30’

14’-6 15/16”

33’-4 1/4”

16’ Projection x 30’

16’-6 15/16”

34’-3 5/16”

18’ Projection x 30’

18’-6 15/16”

35’-3 7/16”

20’ Projection x 30’

20’-6 15/16”

36’-4 9/16”

22’ Projection x 30’

22’-6 15/16”

37’-6 9/16”

24’ Projection x 30’

24’-6 15/16”

38’-9 3/8”

4-Hole base plate 
(typ.)

To fi nd a diagonal measurement not listed here, use 
this formula:  width² + length² = diagonal²

Point A

BACK OF PAVILION

Point D

Point C

“B” DIMENSION - SEE 

TABLE

DIAGONAL

 IS MEASURED 

TO

 CENTER 

BACK 

AND CENTER FRONT

 OF BASE-

PLA

TES 

AS SHOWN IN DET

AILS.

“A” DIMENSION - SEE 

T

ABLE

MEASURED FROM OUTSIDE OF BASE-

PLA

TE 

T

O

 OUTSIDE OF BASEPLA

TE.

1

1’-1 7/8” for 22’

 Projection

12’-1 7/8” for 24’

 Projection

1

1’-5 1/16” for 22’

 Projection

12’-5 1/16” for 24’

 Projection

FRONT OF PAVILION

Point B

30’-0”

10’-0”

10’-0”

10’-0”

C

L Front and Back 

Uprights

C

L Front and Back 

Uprights

Standard 4-hole Base Plate

2-Hole Base Plate for End Uprights

C

L Uprights

C

L Uprights

Содержание Navi-Trac LT/CS

Страница 1: ...instructions before the installation or removal of this product Installation Instructions Navi Trac LT CS Pavilion 12 to 24 Projection 7701 Highway 41 N Evansville IN 47725 Phone 812 867 2421 Fax 812...

Страница 2: ...er lines near the site 5 When anchoring the structure avoid all underground power lines and gas lines or other utility easements 6 Keep site clear of debris to avoid tripping especially while carrying...

Страница 3: ...10 0 PURLIN NAVI TRAC 80410 2 1 2 1 2 1 2 1 2 1 MID TENSIONING TUBE 80779 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 MID TENSIONING TUBE SPLICE 80780 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CONTAINER 1 BASE PLATE ADJUST...

Страница 4: ...PROJECTION END UPRIGHT EAVE WELDMENT RIDGE WELDMENT RWP EAVE END R L WELDMENT RIGHT SHOWN EPR EAVE WELDMENT EWP EPL LEFT OPPOSITE SHOWN FRAME ATTACHING BRACKET BASE PLATE ADJUSTABLE 4 HOLE BAP BA BAS...

Страница 5: ...PROJECTION E10 EAVE SLIDE IN U 8 UPRIGHT 8 RP 22 RAFTER 22 PROJECTION RAFTER X CABLES EPL END LEFT WELDMENT NOTE UPRIGHTS ARE 8 TO 10 AD JUSTABLE HEIGHT EAVE WELD MENT EWP BAP BASE PLATE ADJUSTABLE 4...

Страница 6: ...ructures above 20 projection 2 Hole Base Plate required at this position only LAYOUT DIMENSIONS Pavilion Size A Dimension B Diagonal Dim 12 Projection x 30 12 6 15 16 32 6 3 8 14 Projection x 30 14 6...

Страница 7: ...eye bolt with eye nut not usual On rafters with no X cables attach the rafter using the pin attached to the ridge weldment 6 On frames with 20 projection or more rafter brace is now attached to trian...

Страница 8: ...a Turnbuckles should be open all the way Figure 3a First beam arch as sembled and raised Note Turnbuckles at free end Eyenuts on inside of Rafter Eyenuts face ground on sec ond rafter Eyenuts on insid...

Страница 9: ...lace stabilizer plate washer and hex nut back onto rod so that bracket stays in place Do not tighten until frame and fabric are completely assembled and in stalled Do not use stabilizer plate at corne...

Страница 10: ...dment Figure 4d Purlin Drop curved end of purlin into rafter bracket See figures 4e and 4f Drop square hook end into the correspond ing rafter bracket Note If optional installation kit has been used r...

Страница 11: ...annel on Upright Rear Upper Splice Feed both kedars down at the same time and at the same time until kedars are fully inserted into channels Fig ure 5b Continue this process until all mids are install...

Страница 12: ...Rear Upper Splice Figure 6b After end fabric is in place fiesta buckles on inside of fabric at eave must be con nected Slide kedar pieces with d ring into top outside channel of eave beam Align these...

Страница 13: ...n Check mids to be sure they are all pulled to the same point in front and back Check back end straps to be sure they are tightened uniformly When you have checked these things you may now ratchet the...

Страница 14: ...ction to existing building must be determined by cus tomer Step 8 Fastening Frame to Existing Building At back of pavilion adjust the frame attaching bracket so that is is fitted up to existing buildi...

Страница 15: ...15 Notes...

Страница 16: ...vided in the installation instructions is not a suggestion about what is necessary to meet a site specific load For additional important information consult The IFAI Procedural Handbook For the Safe I...

Отзывы: