Step 3 - Raising the Beam Arches

• Raise 

fi rst beam.  Tie off securely or hold up using adequate installation personnel.  Note:  There are no stakes or guys 

included with this frame, however, the installation kit (sold separately) includes eye bolt and eye nut for attaching to frame 
along with safety webs that may be used to stake or tie-off frame to stabilize the fi rst beam while frame is being assem-
bled.  See Figure 3a.

• 

Raise the second beam arch, keeping base plate in place by using installation personnel or stakes (not included).

Note:  Before Raising Beam Arches, all eye nuts and “X” Cables must be in place as 
shown in Figure 3a.  Turnbuckles should be open all the way.

Figure 3a

First beam arch as-
sembled and raised.

Note:  Turnbuckles 
at free end.

Eyenuts on 
inside of Rafter

Eyenuts face 
ground on sec-
ond rafter.

Eyenuts on 
inside of Rafter

22’ Projection Frame Shown

Frame sizes under 16’ 
projection have only (2) 
cables per bay and no 
purlins.

Note: 

 If you are installing a 2-bay pavilion, both 

bays must be “X” cabled, therefore, eye nuts and 
eye bolts must be used at center beam arch (similar 
to confi guration at right).

1/2” x 3 1/4” cap screw  
and eye nut may be used 
with safety web guys from 
installation kit for stabilizing 
fi rst raised beam.  (instal-
lation kit is an optional 
purchase)

Eyebolt and safety 
webs from installation 
kit may be temporarily 
installed for stabiliz-
ing fi rst raised beam.  
(Use eyebolt with 
eyenut from standard 
frame hardware.)

Eyenut

Содержание Navi-Trac LT/CS

Страница 1: ...instructions before the installation or removal of this product Installation Instructions Navi Trac LT CS Pavilion 12 to 24 Projection 7701 Highway 41 N Evansville IN 47725 Phone 812 867 2421 Fax 812...

Страница 2: ...er lines near the site 5 When anchoring the structure avoid all underground power lines and gas lines or other utility easements 6 Keep site clear of debris to avoid tripping especially while carrying...

Страница 3: ...10 0 PURLIN NAVI TRAC 80410 2 1 2 1 2 1 2 1 2 1 MID TENSIONING TUBE 80779 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 MID TENSIONING TUBE SPLICE 80780 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CONTAINER 1 BASE PLATE ADJUST...

Страница 4: ...PROJECTION END UPRIGHT EAVE WELDMENT RIDGE WELDMENT RWP EAVE END R L WELDMENT RIGHT SHOWN EPR EAVE WELDMENT EWP EPL LEFT OPPOSITE SHOWN FRAME ATTACHING BRACKET BASE PLATE ADJUSTABLE 4 HOLE BAP BA BAS...

Страница 5: ...PROJECTION E10 EAVE SLIDE IN U 8 UPRIGHT 8 RP 22 RAFTER 22 PROJECTION RAFTER X CABLES EPL END LEFT WELDMENT NOTE UPRIGHTS ARE 8 TO 10 AD JUSTABLE HEIGHT EAVE WELD MENT EWP BAP BASE PLATE ADJUSTABLE 4...

Страница 6: ...ructures above 20 projection 2 Hole Base Plate required at this position only LAYOUT DIMENSIONS Pavilion Size A Dimension B Diagonal Dim 12 Projection x 30 12 6 15 16 32 6 3 8 14 Projection x 30 14 6...

Страница 7: ...eye bolt with eye nut not usual On rafters with no X cables attach the rafter using the pin attached to the ridge weldment 6 On frames with 20 projection or more rafter brace is now attached to trian...

Страница 8: ...a Turnbuckles should be open all the way Figure 3a First beam arch as sembled and raised Note Turnbuckles at free end Eyenuts on inside of Rafter Eyenuts face ground on sec ond rafter Eyenuts on insid...

Страница 9: ...lace stabilizer plate washer and hex nut back onto rod so that bracket stays in place Do not tighten until frame and fabric are completely assembled and in stalled Do not use stabilizer plate at corne...

Страница 10: ...dment Figure 4d Purlin Drop curved end of purlin into rafter bracket See figures 4e and 4f Drop square hook end into the correspond ing rafter bracket Note If optional installation kit has been used r...

Страница 11: ...annel on Upright Rear Upper Splice Feed both kedars down at the same time and at the same time until kedars are fully inserted into channels Fig ure 5b Continue this process until all mids are install...

Страница 12: ...Rear Upper Splice Figure 6b After end fabric is in place fiesta buckles on inside of fabric at eave must be con nected Slide kedar pieces with d ring into top outside channel of eave beam Align these...

Страница 13: ...n Check mids to be sure they are all pulled to the same point in front and back Check back end straps to be sure they are tightened uniformly When you have checked these things you may now ratchet the...

Страница 14: ...ction to existing building must be determined by cus tomer Step 8 Fastening Frame to Existing Building At back of pavilion adjust the frame attaching bracket so that is is fitted up to existing buildi...

Страница 15: ...15 Notes...

Страница 16: ...vided in the installation instructions is not a suggestion about what is necessary to meet a site specific load For additional important information consult The IFAI Procedural Handbook For the Safe I...

Отзывы: