AMT IPT 2P5X Series Скачать руководство пользователя страница 3

Specifications Information and Repair Parts Manual  

     

IPT 2P5X, 2S5X, 2S5XC, 3S5X  Series

                                                           

2S5X-250-00

3

2/2018

2.  Install shaft seal rotating half (Ref. No. 8) into bore in impeller hub. 

Lubricate rubber cup of the seal with soapy water. Position in impeller hub 
bore with polished face out. Protect polished face of the seal from damage 
with a piece of cardboard or cloth. Press seal into bore until it bottoms.

3.  Thread impeller onto PTO shaft until impeller spacer bottoms against end 

of  shaft.  If  impeller  rear  shroud  contacts  bracket  first  remove  impeller. 

Add impeller shims (Ref. No. 12) until shaft seats against shims before 
striking bracket.

4.  Measure normal distance from impeller vane front face to bracket inside 

face with a micrometer or similar accurate measuring instrument.

5.  Lay volute (Ref. No. 18) on its nose exposing bracket mounting surface. 

Measure normal distance from volute mounting surface to impeller wear 
face.

6.  Adjust amount of impeller shims until assembled clearance between 

impeller face and volute face is 0.01” to 0.03”.

Install Semi-Open Impeller -3/4” keyed “S” pump kits

1.  Temporarily install impeller (Ref. No. 11) on PTO shaft. End of PTO shaft 

must contact bottom of shaft bore in impeller hub. If impeller rear shroud 
contacts bracket before end of PTO shaft contacts bottom of shaft bore in 
impeller, install shims (Ref. No. 12) in bore until impeller clears bracket.

2.  Measure normal distance from impeller vane front face to bracket inside 

face with a micrometer or similar accurate measuring instrument.

3.  Lay volute (Ref. No. 18) on its nose exposing bracket mounting surface. 

Measure normal distance from volute mounting surface to impeller wear 
face.

4.  Adjust amount of impeller shims until assembled clearance between 

impeller face and volute face is 0.01” to 0.03”. Remove impeller from 
shaft.

5.  Insert key (Ref. No. 14) into impeller keyway.
6.  Install shaft seal rotating half (Ref. No. 8) into bore in impeller hub. 

Lubricate rubber cup of the seal with soapy water. Position in impeller hub 
bore with polished face out. Protect polished face of the seal from damage 
with a piece of cardboard or cloth. Press seal into bore until it bottoms.

7.  Install O-ring (Ref. No. 16) into bore in front of impeller nose. Slide 

impeller screw (Ref. No. 15) into center hole through impeller. If required 
install shims used to set impeller clearance inside impeller bore, position 
on exposed screw end.

8.  Align key with PTO shaft keyway Slide impeller onto PTO shaft. Fix on 

shaft with screw. Torque screw to 140 in-lb.

Install Volute

1.  Lay volute (Ref. No. 18) on its nose exposing bracket mounting surface. 

Install O-ring (Ref. No. 17) into groove.

2.  Position volute on pins (Ref. No. 5) installed in bracket. Volute will go on 

only one way, with discharge opening to the top. Slide volute on pins until 
it seats against bracket.

3. 

Secure volute to bracket with screws (Ref. No.19). Torque screws to 50 

in-lb.

Install Casing

1.  Install check valve (Ref. No. 21) on volute nose. Make certain valve is 

oriented correctly with flapper hinge at the top. Align notch in mounting 

ring with rib cast into top of volute nose.

2.  Install casing O-ring (Ref. No. 20) onto casing (Ref. No. 22). Lubricate 

with soapy water.

3.  Install casing onto bracket. Screws (Ref. No. 27) are held into casing 

body with O-rings (Ref. No. 28) and square nuts (Ref. No. 4) are held 
into bracket ears with clips (Ref. No. 3) to make installation easier. Align 
casing to bracket and install six screws. Torque screws to 100 in-lb.

Install Ports and Plugs

1. 

Install an O-ring (Ref. No. 30) on each of two plugs (Ref. No. 29). Thread 
one plug into fill port on discharge manifold (Ref. No. 24) and one plug 

into casing drain port.

2. 

Align  a  gasket  (Ref.  No.  26)  onto  discharge  flange  of  casing.  Install 

discharge manifold onto casing with four screws (Ref. No. 25). Torque 
screws to 100 in-lbs., alternate tightening screws in a cross pattern to 
eliminate crushing the gasket.

3. 

Align a gasket (Ref. No. 26) onto suction flange of casing. Install suction 
flange (Ref. No. 23) onto casing with four screws (Ref. No. 25). Torque 

screws to 100 in-lbs., alternate tightening screws in a cross pattern to 
eliminate crushing the gasket.

REPAIR AND MAINTENANCE INSTRUCTIONS

Shaft Seal Replacement

1.  Loosen six screws (Ref. No. 27) until screw disengages square nut (Ref. 

No. 4) in bracket.

2.  Remove casing assembly from bracket.
3. 

Remove screws (Ref. No. 19) holding volute (Ref. No. 18) to bracket.

4.  Remove volute.
5.  Remove impeller (Ref. No. 11). Threaded impellers unthread 

counterclockwise  (looking  at  impeller).  Keyed  shaft  impellers;  remove 

impeller screw (Ref. No. 15), inspect O-ring (Ref. No. 16) replace if 
required.

6.  Pry worn rotating half of shaft seal (Ref. No. 8) from impeller hub. Discard 

seal.

7.  Remove screws (Ref. No. 6) holding bracket to engine, inspect O-rings 

(Ref. No. 7), replace if required.

8.  Remove bracket from engine.

9. 

Press stationary half of shaft seal (Ref. No. 8) from bracket. Discard seal.

10.  Replace any O-rings (Ref. Nos. 17 & 20) that show signs of wear or 

damage.

11.  Rebuild pump with new shaft seal. Follow Pump End Assembly 

Instructions.

Cleaning Pump

1.  Loosen six screws (Ref. No. 27) until screw disengages square nut (Ref. 

No. 4) in bracket.

2.  Remove casing assembly from bracket.
3. 

Remove screws (Ref. No.19) holding volute (Ref. No. 18) to bracket.

4.  Remove volute.
5.  Clean debris and sediment from inside of casing, volute, and impeller. 

Clean all volute passages and impeller vanes. Make sure closed impeller 
vane passages are clean by running a wire from impeller outside diameter 
to impeller eye. Remove any foreign objects clogging passages.

6.  Check all parts for excessive wear or damage. Replace parts as required.
7.  Reassemble pump.

IPT Series 2P5X, 2S5X, 2S5XC & 3S5X Pumps

Содержание IPT 2P5X Series

Страница 1: ...loyed 3 Always use a suction strainer to keep large debris out of the pump Position strainer well below liquid surface and on a bed of rocks or other suitable surface If possible tie strainer up so it is suspended off pit bottom As a last resort tie the strainer in a large submerged bucket if bottom of water source is too soft or muddy Before Starting Engine 1 Fill engine crankcase with oil Follow...

Страница 2: ...eller Ref No 11 hub Lubricate seal s rubber cup with soapy water Position in impeller hub bore with polished face out Protect seal s polished face from damage with a piece of cardboard or cloth Press seal into bore until it bottoms 2 Thread impeller onto PTO shaft until it bottoms against bottom of bore in impeller If impeller back shroud hits inside of bracket before contacting end of PTO shaft i...

Страница 3: ...nly one way with discharge opening to the top Slide volute on pins until it seats against bracket 3 Secure volute to bracket with screws Ref No 19 Torque screws to 50 in lb Install Casing 1 Install check valve Ref No 21 on volute nose Make certain valve is oriented correctly with flapper hinge at the top Align notch in mounting ring with rib cast into top of volute nose 2 Install casing O ring Ref...

Страница 4: ...r pump warranty 5 Mechanical shaft seals are a wear item and require periodic replacement Seal life is dependent on many factors including liquid pumped sediment type operating point and suction conditions 6 Inspect for loose fasteners Tighten any loose fasteners immediately BEARING HOUSING REPLACEMENT FOR PEDESTAL MODELS 1 Remove the front pump assembly as described under Shaft Seal Replacement 2...

Страница 5: ... by 1 Install a vacuum gauge on capped suction port Gauge to suction port connection must be 100 air tight 2 Fill pump casing completely with water 3 Run pump at full speed some water will be thrown out of discharge 4 Vacuum gauge should register 18 22 inches of mercury within a minute or so a If vacuum registers below 18 in of hg check gauge to pump connection for air leaks inspect replace volute...

Страница 6: ...eries 2S5X 250 00 6 2 2018 For Repair Parts contact dealer where pump was purchased Please provide following information Model Number Serial Number if any Part description and number as shown in parts list Figure 1 Repair Parts Illustrations IPT Series 2P5X 2S5X 2S5XC 3S5X Pumps ...

Страница 7: ...24 Flat Head Screw N A Incl w Ref 11 N A Incl w Ref 11 N A N A Incl w Ref 11 1 16 109 O Ring N A Incl w Ref 36 N A Incl w Ref 36 N A N A Incl w Ref 36 1 17 167 O Ring P Series Incl w Ref 36 Incl w Ref 36 N A N A N A N A N A 1 160 O Ring S Series N A N A Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 1 18 Volute Kit 2P5X 150 95 2P5X 150 95 2S5X 150 95 2S5X 150 95 2S5X 150 95 ...

Страница 8: ...ket Kit 2PXV 300 90 2PXV 301 90 2SXV 300 90 2SXV 301 90 2SXV 300 90 2SXV 300 90 2SXV 301 90 1 includes Ref Nos 7 8 16 17 20 21 26 29 30 if required 37 Adapter Gasket Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 1 38 Pedestal Drive Kit if required not shown 2760 090 99 3826 090 90 2760 090 99 3826 090 90 2760 090 99 2760 090 99 3826 090 90 1 39 S...

Страница 9: ...Specifications Information and Repair Parts Manual IPT 2P5X 2S5X 2S5XC 3S5X Series 2S5X 250 00 9 2 2018 NOTES ...

Страница 10: ...Specifications Information and Repair Parts Manual IPT 2P5X 2S5X 2S5XC 3S5X Series 2S5X 250 00 10 2 2018 NOTES ...

Страница 11: ......

Страница 12: ...www amtpump com ...

Отзывы: