AMT IPT 2P5X Series Скачать руководство пользователя страница 1

Specifications Information and Repair Parts Manual  

     

IPT 2P5X, 2S5X, 2S5XC, 3S5X  Series

                                                           

2S5X-250-00

1

2/2018

Please read and save this Repair Parts Manual. Read this manual and the General Operating Instructions carefully before attempting to assemble, install, operate 

or maintain the product described. Protect yourself and others by observing all safety information. The Safety Instructions are contained in the General Operating 

Instructions. Failure to comply with the safety instructions accompanying this product could result in personal injury and/or property damage! Retain instructions 

for future reference.  AMT reserves the right to discontinue any model or change specifications at any time without incurring any obligation.

©2018 AMT Pump Company, A Subsidiary of The Gorman-Rupp Company, All Rights Reserved.

Periodic maintenance and inspection is required on all pumps to ensure proper operation. Unit must be clear of debris and sediment. Inspect for leaks and loose bolts. Failure to do so 

voids warranty.

IPT Series 2P5X, 2S5X, 2S5XC & 3S5X Pumps

  

Refer to pump manual 1808-633-00 for General Operating and Safety Instructions.

SPECIFICATIONS

Standard units are constructed of cast aluminum with cast iron impeller (“P” 
series - cast aluminum), cast iron volute, and cast iron suction and discharge 
manifolds. Standard seals are EPDM with silicon-carbide (“P” series – carbon-
ceramic) wear faces.

UNPACKING

1.  Remove pump from packaging materials.
2.  Package should include: pump/engine mounted in roll frame, strainer, 

general/safety manual, specification/parts manual, engine manual. Pump 
kits: Pump end, general safety manual, and specification/parts manual.

3.  Make sure all components are accounted for before discarding packaging 

material.

4.  Inspect all components for damage.
5.  No assembly is required for standard engine driven pumps. Pump kits 

must be constructed on appropriate engine.

PREPARING UNIT FOR OPERATION

Placing Pump

1.  Always place the pump as close to the liquid source as possible. Priming 

efficiency and pump output will be reduced if a long (>25 ft.) suction line 

is used. Keep all lines as short and straight as possible. Avoid any sharp 
bends. Suction line cannot have loops or high spots, hose must have a 
gradual slope up to pump.

2.  Pump/engine must be located on a solid level surface.

Connecting Hose or Piping

1.  All suction hose/piping connection must be air tight. Pump will not prime if 

there are any air leaks in the suction line or connections.

2.  Use only non-collapsible hose or pipe on the suction. If collapsible hose 

is used on the discharge, the end of discharge line is submerged in liquid, 
or a check valve is placed in the discharge line, a means of venting air out 
of the pump during the priming cycle must be employed.

3.  Always use a suction strainer to keep large debris out of the pump. Position 

strainer well below liquid surface and on a bed of rocks or other suitable 

surface. If possible tie strainer up so it is suspended off pit bottom. As a 

last resort tie the strainer in a large submerged bucket if bottom of water 
source is too soft or muddy.

Before Starting Engine

1.  Fill engine crankcase with oil. Follow engine manufacturer 

recommendations for service classification and viscosity of oil as detailed 

in engine manual.

2.  Fill fuel tank with clean, fresh, fuel. Follow engine manufacturer’s 

guidelines as listed in engine manual.

3. 

Always fill pump with liquid through the priming port located on top of the 

discharge manifold or pump casing before starting engine. Remember the 

pump is self-priming only when the pump is filled with liquid.

 

Operation

1. 

Make certain pump is filled with liquid before starting engine. Failure to do 

so will result in damage to the mechanical shaft seal. Never run pump dry.

 

 

DO NOT USE PUMP IN EXPLOSIVE ATMOSPHERE. DO NOT PUMP 
VOLATILE OR FLAMMABLE LIQUIDS.

2.  Follow engine manufacturer’s starting procedure. Run engine at full speed 

during priming. After pump has primed speed may be reduced to regulate 
pump output.

3.  Pump will self-prime to a vertical height of 10’ in less than one minute, 

20’ in 2 minutes, 25’ may take up to 4 minutes. If pump doesn’t prime: 
Check for air leaks, move pump closer to liquid, shorten suction line, 

remove loops and high spots from suction line, refill pump with liquid, see 

troubleshooting guide in this manual.

4.  Always allow engine to cool before refueling.

After Pump is Shut Down

1. 

Always  flush  the  pump  out  at  the  end  of  operation  if  the  liquid  being 

pumped may leave a solid or sticky residue inside of pump, or if a buildup 
of sediment inside the pump is expected.

2.  Always drain pump completely of liquid if there is a chance of freezing.

DESCRIPTION

IPT engine driven pumps are commercial duty, centrifugal, self-priming (to 25 ft. vertical lift after initially filling casing with liquid), portable units. Pumps are 

equipped with industry standard mechanical shaft seals. Iron suction and discharge manifolds are standard male NPT threads for direct connection to swivel 

hose fitting with gasket, or standard NPT pipe fittings. Discharge manifold can be rotated 180˚ (in 90˚ increments); left side discharge, front discharge or right side 
discharge. Pump components will handle liquids with a temperature range of 40˚ to 180˚F (4˚ to 82˚ C). Pump only nonflammable liquids compatible with pump 
component materials. Standard pumps are close coupled to internal combustion engines manufactured by Honda, Briggs & Stratton, & Hatz, AMT specification 

engines and others. All engines meet current EPA emissions requirements. Pumps (70cc and larger) are preempted from emissions regulation in California. Bear-
ing housing/pedestal drive pumps are also available for direct or drive belt connection.

Содержание IPT 2P5X Series

Страница 1: ...loyed 3 Always use a suction strainer to keep large debris out of the pump Position strainer well below liquid surface and on a bed of rocks or other suitable surface If possible tie strainer up so it is suspended off pit bottom As a last resort tie the strainer in a large submerged bucket if bottom of water source is too soft or muddy Before Starting Engine 1 Fill engine crankcase with oil Follow...

Страница 2: ...eller Ref No 11 hub Lubricate seal s rubber cup with soapy water Position in impeller hub bore with polished face out Protect seal s polished face from damage with a piece of cardboard or cloth Press seal into bore until it bottoms 2 Thread impeller onto PTO shaft until it bottoms against bottom of bore in impeller If impeller back shroud hits inside of bracket before contacting end of PTO shaft i...

Страница 3: ...nly one way with discharge opening to the top Slide volute on pins until it seats against bracket 3 Secure volute to bracket with screws Ref No 19 Torque screws to 50 in lb Install Casing 1 Install check valve Ref No 21 on volute nose Make certain valve is oriented correctly with flapper hinge at the top Align notch in mounting ring with rib cast into top of volute nose 2 Install casing O ring Ref...

Страница 4: ...r pump warranty 5 Mechanical shaft seals are a wear item and require periodic replacement Seal life is dependent on many factors including liquid pumped sediment type operating point and suction conditions 6 Inspect for loose fasteners Tighten any loose fasteners immediately BEARING HOUSING REPLACEMENT FOR PEDESTAL MODELS 1 Remove the front pump assembly as described under Shaft Seal Replacement 2...

Страница 5: ... by 1 Install a vacuum gauge on capped suction port Gauge to suction port connection must be 100 air tight 2 Fill pump casing completely with water 3 Run pump at full speed some water will be thrown out of discharge 4 Vacuum gauge should register 18 22 inches of mercury within a minute or so a If vacuum registers below 18 in of hg check gauge to pump connection for air leaks inspect replace volute...

Страница 6: ...eries 2S5X 250 00 6 2 2018 For Repair Parts contact dealer where pump was purchased Please provide following information Model Number Serial Number if any Part description and number as shown in parts list Figure 1 Repair Parts Illustrations IPT Series 2P5X 2S5X 2S5XC 3S5X Pumps ...

Страница 7: ...24 Flat Head Screw N A Incl w Ref 11 N A Incl w Ref 11 N A N A Incl w Ref 11 1 16 109 O Ring N A Incl w Ref 36 N A Incl w Ref 36 N A N A Incl w Ref 36 1 17 167 O Ring P Series Incl w Ref 36 Incl w Ref 36 N A N A N A N A N A 1 160 O Ring S Series N A N A Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 1 18 Volute Kit 2P5X 150 95 2P5X 150 95 2S5X 150 95 2S5X 150 95 2S5X 150 95 ...

Страница 8: ...ket Kit 2PXV 300 90 2PXV 301 90 2SXV 300 90 2SXV 301 90 2SXV 300 90 2SXV 300 90 2SXV 301 90 1 includes Ref Nos 7 8 16 17 20 21 26 29 30 if required 37 Adapter Gasket Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 Incl w Ref 36 1 38 Pedestal Drive Kit if required not shown 2760 090 99 3826 090 90 2760 090 99 3826 090 90 2760 090 99 2760 090 99 3826 090 90 1 39 S...

Страница 9: ...Specifications Information and Repair Parts Manual IPT 2P5X 2S5X 2S5XC 3S5X Series 2S5X 250 00 9 2 2018 NOTES ...

Страница 10: ...Specifications Information and Repair Parts Manual IPT 2P5X 2S5X 2S5XC 3S5X Series 2S5X 250 00 10 2 2018 NOTES ...

Страница 11: ......

Страница 12: ...www amtpump com ...

Отзывы: