
7
Uncrating/Installation Instructions
122993-618
4
INSTALLATION CHECKLIST
Installation checklist must be completed after the washer is in-
stalled and prior to performing the operational test to assure
complete and correct installation.
NOTE: Contact your STERIS sales representative to demonstrate
proper equipment operation and schedule a technician to test your
installation.
❏
Shutoff valves (not by STERIS), for maintenance purposes and
capable of being locked in OFF position only, installed on steam,
air and water lines and in compliance with local codes, OSHA
standards, etc.
❏
Disconnect switches (not by STERIS), capable of being locked in
OFF position only, installed in electrical supply lines near the unit
and in compliance with local codes, OSHA standards, etc.
NOTE: If unit is installed next to other equipment, shutoff valves and
disconnect switches should be located so that service can be shut
off to one piece of equipment at a time.
❏
Washer positioned, as shown on Equipment Drawing, with re-
quired clearance space and in relation to building supply lines.
❏
Washer is level.
❏
If washer is equipped with Drain Discharge Cooldown and Cold
Water Pre-wash option, building cold water line supplies water to
unit at dynamic pressure and temperature as specified on Equip-
ment Drawing.
❏
Building hot water line supplies water to unit at dynamic pressure
and temperature as specified on Equipment Drawing.
❏
If Steam Heated unit, building steam line provides steam to unit
at dynamic pressure as specified on Equipment Drawing.
❏
If Steam Heated unit, building condensate return line is connect-
ed to washer as specified on Equipment Drawing.
❏
Pure water line supplies water to unit at dynamic pressure as
specified on Equipment Drawing.
❏
Building air line supplies air to unit at static pressure as specified
on Equipment Drawing.
❏
Building waste line is connected to washer as specified on
Equipment Drawing.
❏
Building ventilation system is connected to washer as specified
on Equipment Drawing.
❏
Electrical supply for unit is as specified on Equipment Drawing.
❏
Floor surrounding unit has non-slip surface.
Installation Checklist