Amphenol AMPHE-EX L-2124 Скачать руководство пользователя страница 13

Page 13 of 17 

 

Bulkhead Adapter 

 

Bulkhead adapters should be filled to a minimum of 1/16” below the top of the adapter, as shown. Potting flush 
with end of adapter is acceptable. Care must be exercised so that the potting compound does not contaminate the 
bulkhead threads, or spill onto the surfaces of the receptacle flange. 

 

Hermetic Version 

 

 
 
 

Figure Z

 

Hermetic receptacle has an integral potting adapter, and should be filled to a minimum of 1/16” below the top of 
the adapter. Care must be exercised so that the potting compound does not contaminate the solder cups of solder 
style contacts. 

 

 

In preparation for potting, the receptacle is to be mated to its corresponding plug, so that all contacts are mated 
and in their optimal post-potted position. During the potting process, the receptacle connector should be rigidly 
fixtured in a vertical position, by its flange, as shown. This fixture must be capable of holding the mated 
connector pair in that position for a minimum of 12 hours at room temperature. The exiting conductor/cable 
should be fixtured inline and above the connector pair, during the entire 12 hour set time, without disturbance. 

 

 

Mixing/Potting Instructions 

1.

 

The potting compound is pre-measured in a two section Quik-Pak style package. 
This packaging consists of a single plastic bag that is compartmentalized into two 
chambers, each containing one part of the two part compound. The segregating 
device is a called a burst seal, and is a weaker seal than the seal on the perimeter of 
the package. 

2.

 

Lay the Quik-Pak down on a table. Carefully roll the pouch to force the material on 
the side being rolled so the material is forced toward the center of the Quik-Pak. 

3.

 

Squeeze the compartment being rolled so that the burst seal opens and allows the 
material to flow into, and combine with the material in the other compartment. 

4.

 

Mix the entire contents of the bag, by alternately squeezing the bags contents, and 
working the bag across the edge of a table, to fully move the entire contents of the 
bag, back and forth, between chambers. Work the material in this manner, 
constantly, for a minimum of 40 to 50 times. This should take about 2 minutes. 

5.

 

If you see striations, or non-uniform color throughout the Quik-Pak, mix an 
additional 10-15 times. 

6.

 

Once mixed, squeeze all the contents over to one corner of the bag. 

7.

 

Squeeze the material away from the corner to allow making a 3/16” pouring spout by 
snipping off the bags corner. Epoxy must be poured within 10 minutes of mixing. 

8.

 

To minimize air entrapment, slowly pour the compound into the back end of the bulkhead 
adapter, to a level shown in Figure Z. 

9.

 

Avoid getting epoxy onto the sides of the adapter, paying particular attention to the threaded 
area. Epoxy in the threads will impede assembly with the bulkhead. 

10.

 

Set the bag containing the remaining compound aside, so that it may cure. After cure, 
the bag may be disposed of safely, along with common consumer refuse. CAUTION: 
As the remaining compound cures, the bag will become warm. 

 

** WARNING: The receptacles shall only be used where the temperature, at the point 

of entry in service, on the associated enclosure is between 

-40°C and +83.5°C, (where -40°C≤Ta≤+40°C) 

-40°C TO +98.5°C (where  -40°C≤Ta≤+55°C) 

 

 

** Hermetic version ambient temperature range is: 

-40°C≤Ta≤+85°C 

Содержание AMPHE-EX L-2124

Страница 1: ...ontents Familiarization Assembly Contact Preparation and Installation Connector Assembly Part Number Code Logic For additional information consult Amphenol AMPHE EX Catalog 12 056 Amphenol EEC Des Pla...

Страница 2: ...ins Alternative keying options Alternative pin or sleeve contacts in either the plug or receptacle bodies Model Code Designations Connectors EXM a b c d e f g h Connector series type designation EXM S...

Страница 3: ...se only the proper crimping tools that have been set or calibrated with precision gages 8 Make certain that all contacts are the correct size before attempting to assemble in insert cavities This poin...

Страница 4: ...l be carried out by suitably trained personnel in accordance with the applicable code of practice e g EN IEC 60079 14 or EN IEC 61241 14 It is the end user s responsibility to ensure that the product...

Страница 5: ...determined to have reached end of life can be removed from equipment and disassembled for recycling Components that are not accepted by recycler are safe to be disposed of with other commercial waste...

Страница 6: ...g this equipment shall be suitable certified as compliant with EN 60079 28 2007 and provide an inherently safe optical source op is EPL Gb subsequently the following parameters apply Application Tempe...

Страница 7: ...should be re twisted 4 Insert wire and contact into crimping tool as far as possible Crimp contact wire well III Contact Insertion and Removal 1 When inserting or removing contacts first remove secur...

Страница 8: ...melts It is important that you hold everything very steady until solder begins to flow After soldering one or two connections clean and re tin the tip Soldering must be done quickly since you can melt...

Страница 9: ...Contacts Remove sealing plugs Standard Removal Tools Using applicable removal tool insert and carefully work tool tips over wire well When tips bottom contact will release from internal retention clip...

Страница 10: ...Page 10 of 17 TYPICAL...

Страница 11: ...e securement of the Cable Gland to the cable adapter and seal compression around the cable jacket In terms of the Amphe Ex series the Cable Adapter is considered an enclosure and should be treated as...

Страница 12: ...ons required to be determined by end user 9 Thread the receptacle assembly into the bulkhead until the seal touches down and then tighten it by the smallest fraction of a revolution to the first insta...

Страница 13: ...down on a table Carefully roll the pouch to force the material on the side being rolled so the material is forced toward the center of theQuik Pak 3 Squeeze the compartment being rolled so that the bu...

Страница 14: ...927 0 877 0 49 17 1 3 1 242 1 575 0 87 19 1 3 1 242 1 575 0 87 21 1 3 1 242 1 575 0 87 Note Minimum amount of potting required Epoxy Volume Per Hermetic Receptacle with Integral Potting Adapter Shell...

Страница 15: ...ed to Bulkhead Receptacle Figure 3 Hermetic Panel Mount Configuration Inline Plug mated to Hermetic Panel Mount Receptacle ATEX or IECEX CERTIFIED CABLE GLAND IP6X RATED WITH SEALS TEMP RATED 20 C TO...

Страница 16: ...anel Mount Receptacle Part Spigot Diameter mm Spigot Length mm EXM a 02 H 9 d e f g 11 95 11 90 21 EXM a 02 H4 9 d e f g 11 95 11 90 21 EXM a 02 H 11 d e f g 14 95 14 90 21 EXM a 02 H4 11 d e f g 14 9...

Страница 17: ...Ta 40 C Ex tb IIIC T80 C Db 40 C Ta 40 C IP6X II 2 G D Ex db IIC T5 Gb 40 C Ta 55 C Ex op pr IIC T5 Gb 40 C Ta 55 C Ex tb IIIC T95 C Db 40 C Ta 55 C IP6X II 2 G D Ex db IIC T5 Gb 40 C Ta 55 C Ex op i...