~9~

ATTENTION!

We shall avoid the share of power supply with other equipments that may
produce interference radiation. We shall pay special attention to avoiding the
phenomenon that on the time of spark alarm stopping

the power supply of

instrument itself can’t be shut down for output of relay signal.

b) Terminal 4

‘NC’ and terminal 5‘CM’ provide a couple of voltage-free normally

closed relay contacts

that can be used to control the fan and other production

machinery. (Terminal 5 ‘CM ’ and terminal 6 ‘NO’ provide a couple of normally
opened relay contacts.)

Relay 1: This relay is activated when the fire alarm is activated.

Contact Load: U~ 250V

Normal operation or

Spark detected

I 5A

power disconnected

c)Terminal 7 and 8 drive the electromagnetic valve of the diverter

2.2 Electric wring – J13 of the control box

a) Terminal 92

terminal 93 and terminal 94

a voltage-free contact is provided

that can be use to monitor the function status of the machine. In the default

configuration Relay 2 is configured as a Ready Relay.

Relay 2: Ready relay (Recommended warning output)

You can use this switching signal to activate a warning device or to stop the

material flow through the conveying line.

Contact Load: U~ 125V

Normal operation:

Error or power

I 0.6A

disconnected:

b) Terminal 95 and terminal 96 are connected to the Horn –strobe. Terminal 95 is

anode ,terminal 96 is cathode.

2.3 Electric wiring of the main board to the metal detector

The -X90 wiring terminals in the metal detector junction box is connected to the

control box main board through 2 shielded cables, in which the wiring

terminals

is connected to the transmitter cable (TX - cable) ;

The wiring terminals

is connected to the receiver cable (RX - cable).

Содержание AMP-EE01

Страница 1: ...Ver1 91 2013 10 13...

Страница 2: ...vice office of our company 3 Jiangsu Ampeon Electronic Engineering Co Ltd provides services of the three guarantee period 18 months from the delivery date 4 Troubles due to lightening strike water inv...

Страница 3: ...c wiring of the main board to the spark detectors 10 2 5 Electric wiring of the control box to the diverter 10 2 6 Earthing and safety 11 C Using of the control panel 11 1 The instruction of LCD Displ...

Страница 4: ...s in pneumatic transport systems for textile fibers Intelligent identification of metals kinds moving speed to ensure reliable elimination Self monitoring of actuator valve actuation time Automatic re...

Страница 5: ...nstalling 1 1 The installation of the connecting pipe of spark detectors A Spark detectors B X95 junction box C Flange D Observation window Figure 1 The connecting pipe of spark detectors The connecti...

Страница 6: ...s electric motor transformer and fluorescent lamp etc Furthermore it should keep a certain distance from big moving metal object The cables with big current should be also kept a distance from the det...

Страница 7: ...inlet and outlet Because the diverter adopts the fast reaction pneumatic mechanism 600 800kPa stable and clean compressed air must be provided The photoelectric switch is used to be a level sensor It...

Страница 8: ...time taken by diverter to reach activated position after receiving a switching impulse The range of the Safety factor is 1 2 1 3 The I in the following figure 5 is a piece of connection pipe it shoul...

Страница 9: ...tric wiring X95 Spark Detectors Junction Box X90 Metal Detector Junction Box X98 Diverter Junction Box E Control box MSD 01 Figure 6 a Electric wiring of the standard installation Figure 6 b Electric...

Страница 10: ...ies 8 Figure 7 Wiring terminals in the control box Figure 8 Electric wiring of the power board 2 1 Electric wring J0 of the control box a Terminal 1 and terminal 2 are the power input AC220V terminal...

Страница 11: ...agnetic valve of the diverter 2 2 Electric wring J13 of the control box a Terminal 92 terminal 93 and terminal 94 a voltage free contact is provided that can be use to monitor the function status of t...

Страница 12: ...X95 The wiring terminals No 32 to No 37 on the main board in the control box are connected to the terminals of the spark detector junction box X95 2 5 Electric wiring of the control box to the diverte...

Страница 13: ...rhauling please first shut down the power supply and interrupt the compressed air supply The temperature of the radiator is very high So don t touch it to avoid burn c After the fire alarm is activate...

Страница 14: ...yed after the keyboard locked Table 1 Instructions of the main page The Operation LED should always light up during operation It will not light up for a while when the metal is detected If it does not...

Страница 15: ...park 2 Fire The record of fire alarm is twice Table 2 Explanation on the fire alarm display 3 Pressing the key FUN press FUN under the state of key locked to enter into the Parameter setting menu see...

Страница 16: ...ter pressing the key FUN on the main menu page you will turn to the menu page of Parameter setting Figure 14 Parameter settings main menu When the cursor is flashing in the 1 1 Real time set item pres...

Страница 17: ...at we can lock the keyboard now pressing the key to select ON or OFF 3 When the cursor is flashing in the 3 Auto RST item shows that we can press the key to enable or disable the Auto RST When the Aut...

Страница 18: ...ctuated Use the key can set the parameter The setting precision of the activate parameter is 0 01S and the setting range is 0 00S 3 00S If press for 3 seconds simultaneously the data would change cont...

Страница 19: ...the same time the diverter actuated and the Relay 1 is activated They would reset automatically 2 3seconds later When the cursor flashes in the second item of Spark SD2 press key and the test lamp wil...

Страница 20: ...on the main board see figure 9 When the cursor flashes in NO 5 5 com set item in parameter setting menu you can enter into to the Communication setting page by press FUN simultaneously Figure 20 Comm...

Страница 21: ...from registers Command message Response message 3 4 Address list Status monitor Read only 0000H bit0 1 metal is in action bit1 1 the hopper is full bit7 1 Chinese 0 English bit8 1 detected the spark b...

Страница 22: ...he spark alarm function should be checked regularly with simulation test to assure that they are in the good working status It is suggested that the test be carried out at least once every two weeks T...

Страница 23: ...verter actuated but you can t find the test metal in the collecting box you should carefully observe and repeatedly adjust Activate and reset parameter until you can reliably divert the test metal In...

Страница 24: ...AMPEON AMP Series 22...

Отзывы: