![Ampac NZ 100 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/ampac/nz-100/nz-100_operators-manual_2934101011.webp)
AMPAC INDUSTRIES LTD
NZ 100 OPERATORS MANUAL
Page 11
Doc No: g0097wo1.doc
Dir No: L:\manuals
Date: 10/5/00
Rev: 1
6.0
INSTALLATION AND INITIAL OPERATION
6.1 INSTALLING THE NZ3200
Do not apply power or connect batteries during this procedure.
1.
Unpack NZ100.
2.
Check for transit damage.
3.
Drill all cable access and mounting holes.
4.
Mount the unit into position.
5.
Feed cables into the unit.
6.
Connect mains cabling to the mains terminal block.
7.
Connect detector cabling.
8.
Connect ancillary cabling.
9.
Set links as required. See section 5.
10.
Ensure all swarf is removed from panel before applying power.
6.2 INITIAL OPERATION
1.
Switch on mains power to the unit.
2.
Battery defect LED should illuminate after 10 seconds.
3.
Connect batteries. Press ‘RESET’, Battery defect LED should extinguish.
4.
The unit is ready for operation.