Outdoor Unit Installation Guidelines 

  Where a wall or other obstacle is in the path of outdoor unit’s intake or exhaust airflow, follow the installation 

guidelines below. 

  For any of the below installation patterns, the wall height on the exhaust side should be 1200 mm or less. 

 

More than 100

w

e

i

v

p

o

T

w

e

i

v

e

d

i

S

1200

or

less

More than 1000

More than 100

More than 1000

More than 100

More than 300

More

than 100

More than 1000

More than 100

Top view

Unit : mm

Wall facing one side

Wall facing two side

Wall facing three side

 

11.2  Install The Outdoor Unit 

  After selecting the best location, start installation 

to Indoor/Outdoor Unit Installation Diagram. 
1.  Fix the unit on concrete or rigid frame firmly 

and horizontally by bolt nut (ø10 mm). 

2.  When installing at roof, please consider strong 

wind and earthquake. 
Please fasten the installation stand firmly with 
bolt or nails. 

 

A

B

C

D

 

 

Model 

       CU-4Z80***, 

CU-5Z90*** 

620 mm 

170 mm 

20 mm 

380.5 mm

11.3  Connect The Piping 

  Remove the cabinet side plate (metal) from the 

unit by loosening six screws. 

 

Connecting The Piping To Outdoor Unit 

Decide piping length and then cut by using pipe 
cutter. Remove burrs from cut edge. Make flare 
after inserting the flare nut (locate at valve) onto 
the copper pipe. 
Align center of piping to valves and then tighten 
with torque wrench to the specified torque as 
stated in the table. 

 

Do not over tighten, over tightening may cause gas leakage 

Piping size 

Torque 

1/4" [6.35 mm]  

[18N•m (1.8 kgf.m)] 

3/8" [9.52 mm] 

[42 N•m (4.3 kgf.m)] 

1/2" [12.7 mm] 

[55 N•m (5.6 kgf.m)] 

5/8" [15.88 mm] 

[65 N•m (6.6 kgf.m)] 

3/4" [19.05 mm] 

[100N•m (10.2 kgf.m)] 

AMP Air Conditioning

www.ampair.co.uk | [email protected]

Содержание CU-4Z80 Series

Страница 1: ...iping Amin M 2 5 LFL 5 4 h0 2 Amin Required minimum room area in m2 M Required charge amount in appliance in kg LFL Lower flammable limit 0 306 kg m3 h0 Installation height of the appliance 1 8 m for...

Страница 2: ...Unit Installation Diagram 1 Fix the unit on concrete or rigid frame firmly and horizontally by bolt nut 10 mm 2 When installing at roof please consider strong wind and earthquake Please fasten the ins...

Страница 3: ...side of CS MZ16 CS TZ25 CS MTZ16 CS TZ35 CS Z20 CS TZ42 CS Z25 CS TZ50 CS Z35 CS TE20 CS Z42 CS TE25 CS Z50 CS TE35 CS XZ20 CS TE42 CS XZ25 CS TE50 CS XZ35 CS E9 CS XZ50 CS E12 CS TZ20 CS E18 Liquid s...

Страница 4: ...if there is a constant pressure drop Move to next step Step 2 Refrigerant leak detection if there is any pressure drop Otherwise release the Nitrogen gas and move to Step 3 Evacuation of the equipmen...

Страница 5: ...ptor Outdoor unit Liquid side Gas side OPEN Vacuum pump Liquid side 3 way valve Gas side 3 way valve Liquid side Gas side Tube connector Tube connector Tube connector Tube connector Close Close Indoor...

Страница 6: ...s at the interface point are sufficient for the installation of the equipment CU 4Z80 Unit D Unit C Unit A Unit B Indoor Outdoor connection cable Power Supply Cord Isolating Devices Indoor Unit A Indo...

Страница 7: ...remove the burrs 2 Remove the burrs by using reamer If burrs is not removed gas leakage may be caused Turn the piping end down to avoid the metal powder entering the pipe 3 Please make flare after in...

Отзывы: