background image

User Guide - ATU 

 

 

4 von 8

 

Technical Data are subject to change without 

notice

 

User Guide ATU v.5.0 Test 

kit.docx-5.0

 

 

3  Hardware 

 

Check polarity of Power supply unit and connect it to the ATU Box (for ATU-1) or to Adapter Box 
(for ATU-2); 

Connect the ATU Box with the PC (USB) and wait until the PC recognized and installed the ATU 
Box; 

Connect ATU Box with measuring head using connection scheme (Page 2)

 

4  Software Manual 

 

Start the Software with desktop icon or file AMO_ATU.exe in installed folder; 

 

 

 

 

Select type of ATU Box (ATU-1 or ATU-2); 

 

 

 

Enter the part number for your measurement system and press “Search” button. If the system is 
found it will automatically select the right settings 
 

 

 
 
 
 
 
 
 
 
 

Click “Connect to device” button.  
If connection with ATU Box is set successfully, the button will change colour and name. 

Содержание ATU

Страница 1: ...v 5 0 Test kit docx 5 0 AMO GmbH ATU Test kit Contents 1 Generalities 2 2 Software Installation 3 3 Hardware 4 4 Software Manual 4 5 Position measurement ATU 1 and ATU 2 5 6 Measuring of signal accura...

Страница 2: ...ATU 1 connection scheme Pic 2 ATU 2 connection scheme Minimal PC requirements Processor 1GHz RAM 512 MB Operating system Windows XP or higher Hardware ATU Box ATU 1 or ATU 2 USB cable ATU to PC Conne...

Страница 3: ...to change without notice User Guide ATU v 5 0 Test kit docx 5 0 ATU 1 Test Kit ATU 2 Test Kit 2 Software Installation Download software from official site of AMO GmbH http www amo gmbh com Launch the...

Страница 4: ...ized and installed the ATU Box Connect ATU Box with measuring head using connection scheme Page 2 4 Software Manual Start the Software with desktop icon or file AMO_ATU exe in installed folder Select...

Страница 5: ...sages Please follow the instructions and try again To stop measurement process click Stop button If you need to set 0 position click Set current position as 0 button The button will change name to Res...

Страница 6: ...f periods Here you have an opportunity to set measurement speed precision between 1 and 30 and minimal periods quantity for measurement between 50 and 2100 The precision of evaluation is higher for un...

Страница 7: ...www amo gmbh com If the ATU Box was connected successfully you can start getting functional reserve value with click at Start button The Functional Reserve value is updated during the movement After...

Страница 8: ...BiSS C Encoder registers Get Register button reads all the registers form the current slave By double clicking on a value the user is able to type a new value for the register All values are in hexade...