8
-
3
8.2 Lubrication
Lubricate the cart according to the following
schedule.
IMPORTANT:
The following time schedule is
for cart use in normal conditions. Severe or
unusual conditions may require more
frequent lubrication.
Grease Type
Use only SAE multipurpose high temperature/
extreme pressure grease with less than 1%
molybdenum disulfide.
IMPORTANT:
Clean all Grease fittings before
lubricating. Replace any missing or damaged
fittings immediately. If a fitting fails to take
grease, replace it.
Before 1st Use
1.
Grease the hitch and check all other
grease points
2.
Grease upper and lower lift cylinders
3.
Grease both ends of all cylinders
4.
Grease the top tilt rollers
12 Hours*
1.
Grease upper and lower lift rollers.
48 Hours*
1.
Grease both ends of all cylinders.
2.
Lubricate the track assembly with a silicon
base penetrating spray.
3.
Grease the hitch implement ring.
4.
Grease hitch pivot points.
250 Hours* or Annually
1.
Remove and clean upper and lower rollers.
Inspect rollers for flat spots.
2.
Remove and clean all cylinder pins. Check
pins for any excessive wear or damage.
3.
Remove and clean all hinge pins. Check
pins for any excessive wear or damage.
4.
Check the wear on the plastic lift slides.
Replace if necessary.
5.
Check the wear on all cylinder bushings.
Replace if necessary.
Содержание Crop Chaser 1000
Страница 2: ...i This page is intentionally left blank ...
Страница 4: ...iii This page is intentionally left blank ...
Страница 16: ...3 3 168 283 in 161 439 in 161 439 in 424 214 in ...